The need for a quality construction industry’s product gives challenge for providers of construction services. On the other hand, the construction industry still faces the problem of inefficiency in the implementation of the construction process. Lean construction is a new approach in constructi...

Full description

Saved in:
Bibliographic Details
Main Author: SEPTIAN (NIM : 15007088) ; Pembimbing : IR. MUHAMAD ABDUH, MT., PH.D, FAJRI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18447
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:18447
spelling id-itb.:184472017-09-27T10:25:48Z#TITLE_ALTERNATIVE# SEPTIAN (NIM : 15007088) ; Pembimbing : IR. MUHAMAD ABDUH, MT., PH.D, FAJRI Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18447 The need for a quality construction industry’s product gives challenge for providers of construction services. On the other hand, the construction industry still faces the problem of inefficiency in the implementation of the construction process. Lean construction is a new approach in construction. Last Planner system on lean construction aims to reduce waste and maximize value by performing scheduling and controlling production units as well. This thesis aims to analyze the application of scheduling and controlling are performed on one EPC project and then compare it with the principles of last planner system. The method used uses descriptive analytical method. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The need for a quality construction industry’s product gives challenge for providers of construction services. On the other hand, the construction industry still faces the problem of inefficiency in the implementation of the construction process. Lean construction is a new approach in construction. Last Planner system on lean construction aims to reduce waste and maximize value by performing scheduling and controlling production units as well. This thesis aims to analyze the application of scheduling and controlling are performed on one EPC project and then compare it with the principles of last planner system. The method used uses descriptive analytical method.
format Final Project
author SEPTIAN (NIM : 15007088) ; Pembimbing : IR. MUHAMAD ABDUH, MT., PH.D, FAJRI
spellingShingle SEPTIAN (NIM : 15007088) ; Pembimbing : IR. MUHAMAD ABDUH, MT., PH.D, FAJRI
#TITLE_ALTERNATIVE#
author_facet SEPTIAN (NIM : 15007088) ; Pembimbing : IR. MUHAMAD ABDUH, MT., PH.D, FAJRI
author_sort SEPTIAN (NIM : 15007088) ; Pembimbing : IR. MUHAMAD ABDUH, MT., PH.D, FAJRI
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/18447
_version_ 1820745885089267712