OPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR

Cut and fill method in underground mining that was conducted by PT. Antam demand a new hole opening as an access to get the ore. This activity known as developement. Developement activity usually done by drilling and blasting process. Blasting result expected to achieve advance at minimum 80% of the...

Full description

Saved in:
Bibliographic Details
Main Author: ISMI (NIM : 12105003); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc; Dr. Ganda Marihot Siman, FARIZ
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18456
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:18456
spelling id-itb.:184562017-09-27T10:39:05ZOPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR ISMI (NIM : 12105003); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc; Dr. Ganda Marihot Siman, FARIZ Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18456 Cut and fill method in underground mining that was conducted by PT. Antam demand a new hole opening as an access to get the ore. This activity known as developement. Developement activity usually done by drilling and blasting process. Blasting result expected to achieve advance at minimum 80% of the borehole depth. <br /> <br /> <br /> The research is done at one of the developement "front," which is Ramp Down Central. In this location, the blasting pattern consist of 40 or 44 blastholes and 1 <br /> <br /> <br /> empty hole with a diameter of 38 mm. From the observation, it is find out that the average advance is 69,9% from the hole depth. Therefore the research is carried out to find the cause of the bad advance and also to make a new blasting pattern to increase the advance. In this research, scanline was done to observe rock mass characteristic and also there was an observation of the geometry of the blasting pattern and drilling technique. RMR value at the research location is 65. Powder factor (PF) based on RMR is 2,34 kg/m3. The blasting pattern from the calculation needed 45 blastholes and 4 empty holes. From the blasting trial, the average of the advance is 81,7% and the PF is 2,42 <br /> <br /> <br /> kg/m3. Based on the blasting and observation data analysis, bad advance is caused by lack of empty hole, drilling deviation, and the burden and spacing between blastholes is too vast. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Cut and fill method in underground mining that was conducted by PT. Antam demand a new hole opening as an access to get the ore. This activity known as developement. Developement activity usually done by drilling and blasting process. Blasting result expected to achieve advance at minimum 80% of the borehole depth. <br /> <br /> <br /> The research is done at one of the developement "front," which is Ramp Down Central. In this location, the blasting pattern consist of 40 or 44 blastholes and 1 <br /> <br /> <br /> empty hole with a diameter of 38 mm. From the observation, it is find out that the average advance is 69,9% from the hole depth. Therefore the research is carried out to find the cause of the bad advance and also to make a new blasting pattern to increase the advance. In this research, scanline was done to observe rock mass characteristic and also there was an observation of the geometry of the blasting pattern and drilling technique. RMR value at the research location is 65. Powder factor (PF) based on RMR is 2,34 kg/m3. The blasting pattern from the calculation needed 45 blastholes and 4 empty holes. From the blasting trial, the average of the advance is 81,7% and the PF is 2,42 <br /> <br /> <br /> kg/m3. Based on the blasting and observation data analysis, bad advance is caused by lack of empty hole, drilling deviation, and the burden and spacing between blastholes is too vast.
format Final Project
author ISMI (NIM : 12105003); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc; Dr. Ganda Marihot Siman, FARIZ
spellingShingle ISMI (NIM : 12105003); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc; Dr. Ganda Marihot Siman, FARIZ
OPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR
author_facet ISMI (NIM : 12105003); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc; Dr. Ganda Marihot Siman, FARIZ
author_sort ISMI (NIM : 12105003); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc; Dr. Ganda Marihot Siman, FARIZ
title OPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR
title_short OPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR
title_full OPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR
title_fullStr OPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR
title_full_unstemmed OPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR
title_sort optimation study of blasting pattern to increase the advance of blasting at ramp down central, ciurug level 500, pt antam ubpe pongkor
url https://digilib.itb.ac.id/gdl/view/18456
_version_ 1820745887566004224