OPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR
Cut and fill method in underground mining that was conducted by PT. Antam demand a new hole opening as an access to get the ore. This activity known as developement. Developement activity usually done by drilling and blasting process. Blasting result expected to achieve advance at minimum 80% of the...
Saved in:
Main Author: | ISMI (NIM : 12105003); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc; Dr. Ganda Marihot Siman, FARIZ |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18456 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SILL PILLAR STABILITY ANALYSIS BASED ON JOINT MEASURING IN SOUTH CIURUG UNDERGROUND MINE, PT ANEKA TAMBANG Tbk. UBPE PONGKOR
by: OKTA TRIANSYAH (NIM : 12105018); Pembimbing : Dr. Ir. Budi Sulistianto, MT., ALHADI -
Stability evaluation of Ciurug mine tunnel based on geomechanical classification in cut and fill Pongkor gold underground mine PT. Antam., TBK West Java Indonesia
by: , PHONEKEO, Vithaya, et al.
Published: (2009) -
ANALISIS ESTIMASI CADANGAN EPITERMAL AU-AG BERDASARKAN LEBAR INTERVAL KOMPOSIT CONTO DENGAN METODE PENAKSIRAN IDS, NNP, DAN KRIGING STUDI KASUS: URAT CIURUG BLOK SELATAN 3, UBPE PONGKOR, LEVEL 500 DAN LEVEL600
by: PRASETYO ZEN , ERIK -
VENTILATION SYSTEM ANALYSIS With COEFFICIENT DIFFUSION CALCULATING of TRACER GAS METHOD in UBPE PONGKOR
by: EKA PUTRA (NIM 12101011), YULHANDRA -
Sample Composite Mechanism to Reduce the Erratic Grade Distribution In Resource Estimation of Au-Ag Epithermal, Ciurug Vein, Block 3 South, Level 500 And 600, Pongkor Mine
by: , E. P. Zen
Published: (2009)