#TITLE_ALTERNATIVE#
Construction projects tend to have increased in volume and complexity in line with the development in civil engineering and architecture. These conditions lead to increased risk of the project failure given the characteristics of the construction projects that are fragmented (fragmented industry). I...
Saved in:
Main Author: | (NIM: 15007119) ; Pembimbing : Ir. Ima Fatima, M.Eng, FEBRYO |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18474 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: WINDRA KUSUMOWARDANI (NIM : 15007084) ; Pembimbing : Ir. Ima Fatima, M.Eng., ESTIYANI -
#TITLE_ALTERNATIVE#
by: ARFENIA NITA (NIM : 15007122); Dosen Pembimbing : Ir. Ima Fatima, M. Eng, -
#TITLE_ALTERNATIVE#
by: MIRAYANI (NIM : 22710001); Pembimbing : Dr. Ir. Lilik Eko Widodo, MS., IMA -
#TITLE_ALTERNATIVE#
by: RADIANTI (NIM 25597059); Pembimbing: Ir. Muhammad Tasrif, M.Eng., JAZIAR -
#TITLE_ALTERNATIVE#
by: PARTONI (NIM 13203007); Pembimbing: Ir. Nana Rachmana, M.Eng., DERY