CONSTRUCTION COST CASH FLOW COMPILATION OF CISOMANG BRIDGE IN CIPULARANG HIGHWAY
A well implementation of construction activity could not be separated from the efforts to control time, cost, and quality of the infrastructure as a product of the construction activity itself. Each of the parties involved in construction activities have always wanted to create an infrastructure wit...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18564 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |