MINIMIZE DOWN-TIME AFTER BLACK-OUT IN THE ELECTRICAL POWER SYSTEM OF PT.PUNCAKJAYA POWER
As a leading provider of electrical services, PT.Puncakjaya Power (PT.PJP) very concern and priority to three main aspects of the electrical operating system of power quality (power quality), economic dispatch and reliability (reliability) in supplying electric power system for PT.Freeport Indonesia...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18570 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |