MINIMIZE DOWN-TIME AFTER BLACK-OUT IN THE ELECTRICAL POWER SYSTEM OF PT.PUNCAKJAYA POWER

As a leading provider of electrical services, PT.Puncakjaya Power (PT.PJP) very concern and priority to three main aspects of the electrical operating system of power quality (power quality), economic dispatch and reliability (reliability) in supplying electric power system for PT.Freeport Indonesia...

Full description

Saved in:
Bibliographic Details
Main Author: WIDADA (NIM : 29109145); Dosen Pembimbing: Dr. Ir. Mursyid Hasan Basri, HADI
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18570
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia