STRATEGI BISNIS GRUP CAD DESIGNER CSE DALAM PENINGKATAN PRODUKSI GAMBAR PROYEK PENGEMBANGAN PT FREEPORT INDONESIA
In an effort to maintain continuity of mine production in order to meet the processing capacity of about 220,000 – 250,000 tons per day, and to replace production capacity of the open pit mine that is expected to be finished in 2016, PT Freeport Indonesia continue to perform new development proje...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18598 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |