PEMELIHARAAN PERALATAN MATERIAL HANDLING PADA PABRIK BESI SPONS PT KRAKATAU STEEL
ABSTRACT <br /> <br /> <br /> Looking forward business situations, management of PT Krakatau Steel (Tbk) including Direct <br /> <br /> <br /> Reducton Plant (DRP), tries to increase employee productivity by streamlining the organization and <br /> <...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18610 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:18610 |
---|---|
spelling |
id-itb.:186102017-09-27T15:31:13ZPEMELIHARAAN PERALATAN MATERIAL HANDLING PADA PABRIK BESI SPONS PT KRAKATAU STEEL Suryowidagdo (NIM : 29110424); Academic Counsellor: Dr.Ir. Mursyid Hasan Basri, Harry Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18610 ABSTRACT <br /> <br /> <br /> Looking forward business situations, management of PT Krakatau Steel (Tbk) including Direct <br /> <br /> <br /> Reducton Plant (DRP), tries to increase employee productivity by streamlining the organization and <br /> <br /> <br /> letting position left by retired person empty, but on the other side there is a generation gap between <br /> <br /> <br /> experienced existing personnel and new hired employee. Another aspect in DRP is increasing <br /> <br /> <br /> capacity by implementing Zero Reformer Process (ZR) and decreasing raw material handling <br /> <br /> <br /> stockyard which is used by new Blast Furnace (BF) project, Decreasing person and increasing <br /> <br /> <br /> capacity may bring operational difficulties and not optimal in DR Plant maintenance. <br /> <br /> <br /> To achieve productivity targets and avoiding operational and maintenance difficulties, there are two <br /> <br /> <br /> major possibilities, 1. Not outsourcing which are: keeping current organization and contract scheme <br /> <br /> <br /> condition (do nothing), applying new organization structure which eliminating and merging some <br /> <br /> <br /> position, and operating without any outsource personnel. 2. outsourcing, which are: manpower <br /> <br /> <br /> contract for Operation & Maintenance (O&M)., maintenance service contract, full maintenance <br /> <br /> <br /> contract (include spare part) and Full O&M Contract. Each option is given the advantage, <br /> <br /> <br /> disadvantage and constraints including cost, risk and also government regulations <br /> <br /> <br /> To choose options, we use AHP process, comparimg each alternative with predicted cost and risk <br /> <br /> <br /> factor for each option. The result of the study brings Operation & Maintenance Contract (O&M) is <br /> <br /> <br /> the most suitable among options. Implementing this option may need preparation in reviewing <br /> <br /> <br /> existing contract and preparation in completing equipment data and procedures. <br /> <br /> <br /> This study took part in pellets raw material handling process which decision steps can also be <br /> <br /> <br /> applied to other location in DR Plant and possibility for whole factory. <br /> <br /> <br /> Keywords: maintenance , raw material handling, not optimal, risiko, AHP, outsourcing text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
ABSTRACT <br />
<br />
<br />
Looking forward business situations, management of PT Krakatau Steel (Tbk) including Direct <br />
<br />
<br />
Reducton Plant (DRP), tries to increase employee productivity by streamlining the organization and <br />
<br />
<br />
letting position left by retired person empty, but on the other side there is a generation gap between <br />
<br />
<br />
experienced existing personnel and new hired employee. Another aspect in DRP is increasing <br />
<br />
<br />
capacity by implementing Zero Reformer Process (ZR) and decreasing raw material handling <br />
<br />
<br />
stockyard which is used by new Blast Furnace (BF) project, Decreasing person and increasing <br />
<br />
<br />
capacity may bring operational difficulties and not optimal in DR Plant maintenance. <br />
<br />
<br />
To achieve productivity targets and avoiding operational and maintenance difficulties, there are two <br />
<br />
<br />
major possibilities, 1. Not outsourcing which are: keeping current organization and contract scheme <br />
<br />
<br />
condition (do nothing), applying new organization structure which eliminating and merging some <br />
<br />
<br />
position, and operating without any outsource personnel. 2. outsourcing, which are: manpower <br />
<br />
<br />
contract for Operation & Maintenance (O&M)., maintenance service contract, full maintenance <br />
<br />
<br />
contract (include spare part) and Full O&M Contract. Each option is given the advantage, <br />
<br />
<br />
disadvantage and constraints including cost, risk and also government regulations <br />
<br />
<br />
To choose options, we use AHP process, comparimg each alternative with predicted cost and risk <br />
<br />
<br />
factor for each option. The result of the study brings Operation & Maintenance Contract (O&M) is <br />
<br />
<br />
the most suitable among options. Implementing this option may need preparation in reviewing <br />
<br />
<br />
existing contract and preparation in completing equipment data and procedures. <br />
<br />
<br />
This study took part in pellets raw material handling process which decision steps can also be <br />
<br />
<br />
applied to other location in DR Plant and possibility for whole factory. <br />
<br />
<br />
Keywords: maintenance , raw material handling, not optimal, risiko, AHP, outsourcing |
format |
Theses |
author |
Suryowidagdo (NIM : 29110424); Academic Counsellor: Dr.Ir. Mursyid Hasan Basri, Harry |
spellingShingle |
Suryowidagdo (NIM : 29110424); Academic Counsellor: Dr.Ir. Mursyid Hasan Basri, Harry PEMELIHARAAN PERALATAN MATERIAL HANDLING PADA PABRIK BESI SPONS PT KRAKATAU STEEL |
author_facet |
Suryowidagdo (NIM : 29110424); Academic Counsellor: Dr.Ir. Mursyid Hasan Basri, Harry |
author_sort |
Suryowidagdo (NIM : 29110424); Academic Counsellor: Dr.Ir. Mursyid Hasan Basri, Harry |
title |
PEMELIHARAAN PERALATAN MATERIAL HANDLING PADA PABRIK BESI SPONS PT KRAKATAU STEEL |
title_short |
PEMELIHARAAN PERALATAN MATERIAL HANDLING PADA PABRIK BESI SPONS PT KRAKATAU STEEL |
title_full |
PEMELIHARAAN PERALATAN MATERIAL HANDLING PADA PABRIK BESI SPONS PT KRAKATAU STEEL |
title_fullStr |
PEMELIHARAAN PERALATAN MATERIAL HANDLING PADA PABRIK BESI SPONS PT KRAKATAU STEEL |
title_full_unstemmed |
PEMELIHARAAN PERALATAN MATERIAL HANDLING PADA PABRIK BESI SPONS PT KRAKATAU STEEL |
title_sort |
pemeliharaan peralatan material handling pada pabrik besi spons pt krakatau steel |
url |
https://digilib.itb.ac.id/gdl/view/18610 |
_version_ |
1820745932305596416 |