STUDY OF PASSENGER TRAVEL DEMAND IN CABLE CAR CONSTRUCTION SEGMENT STATION HALL-LEMBANG

Volume density of vehicles in the segment Station Hall -Lembang, especially during rush hour causes the stacking of vehicles at the same time and the increase in travel <br /> <br /> <br /> time. Urban transportation that is available is not fully capable of addressing the issue....

Full description

Saved in:
Bibliographic Details
Main Author: SARJONO (NIM : 15005112); Pembimbing: Ir. Harun Al-Rasyid Lubis, M.Sc., Ph.D., IMAM
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18691
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:18691
spelling id-itb.:186912017-09-27T10:25:48ZSTUDY OF PASSENGER TRAVEL DEMAND IN CABLE CAR CONSTRUCTION SEGMENT STATION HALL-LEMBANG SARJONO (NIM : 15005112); Pembimbing: Ir. Harun Al-Rasyid Lubis, M.Sc., Ph.D., IMAM Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18691 Volume density of vehicles in the segment Station Hall -Lembang, especially during rush hour causes the stacking of vehicles at the same time and the increase in travel <br /> <br /> <br /> time. Urban transportation that is available is not fully capable of addressing the issue. For that we need the construction of a new mode that has its own path so as not to interfere with traffic jams that occur, ie the cable car. The methods used to model and observe the behavior of users in the selected mode compared are Stated Preference. This method is also able to predict the magnitude of travel demand of passengers who will switch from the existing mode of using the mode of the cable car in an objective and measurable against the existing mode of using certain service attributes. The attributes used in this study namely tariffs, travel time, waiting time and operation time. Binomial logit concept is used to estimate the probability of selection of modes by looking at the difference in utilities of the two modes are compared. The scenarios are arranged in predicting the magnitude of demand for cable car journey is divided into three, namely the optimistic scenario, the median, and pessimistic. From the demand analysis predicted results obtained by cable car (the middle scenario) in 2013 amounting to 26,897 passengers and will continue to increase by 96,874 passengers in 2043. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Volume density of vehicles in the segment Station Hall -Lembang, especially during rush hour causes the stacking of vehicles at the same time and the increase in travel <br /> <br /> <br /> time. Urban transportation that is available is not fully capable of addressing the issue. For that we need the construction of a new mode that has its own path so as not to interfere with traffic jams that occur, ie the cable car. The methods used to model and observe the behavior of users in the selected mode compared are Stated Preference. This method is also able to predict the magnitude of travel demand of passengers who will switch from the existing mode of using the mode of the cable car in an objective and measurable against the existing mode of using certain service attributes. The attributes used in this study namely tariffs, travel time, waiting time and operation time. Binomial logit concept is used to estimate the probability of selection of modes by looking at the difference in utilities of the two modes are compared. The scenarios are arranged in predicting the magnitude of demand for cable car journey is divided into three, namely the optimistic scenario, the median, and pessimistic. From the demand analysis predicted results obtained by cable car (the middle scenario) in 2013 amounting to 26,897 passengers and will continue to increase by 96,874 passengers in 2043.
format Final Project
author SARJONO (NIM : 15005112); Pembimbing: Ir. Harun Al-Rasyid Lubis, M.Sc., Ph.D., IMAM
spellingShingle SARJONO (NIM : 15005112); Pembimbing: Ir. Harun Al-Rasyid Lubis, M.Sc., Ph.D., IMAM
STUDY OF PASSENGER TRAVEL DEMAND IN CABLE CAR CONSTRUCTION SEGMENT STATION HALL-LEMBANG
author_facet SARJONO (NIM : 15005112); Pembimbing: Ir. Harun Al-Rasyid Lubis, M.Sc., Ph.D., IMAM
author_sort SARJONO (NIM : 15005112); Pembimbing: Ir. Harun Al-Rasyid Lubis, M.Sc., Ph.D., IMAM
title STUDY OF PASSENGER TRAVEL DEMAND IN CABLE CAR CONSTRUCTION SEGMENT STATION HALL-LEMBANG
title_short STUDY OF PASSENGER TRAVEL DEMAND IN CABLE CAR CONSTRUCTION SEGMENT STATION HALL-LEMBANG
title_full STUDY OF PASSENGER TRAVEL DEMAND IN CABLE CAR CONSTRUCTION SEGMENT STATION HALL-LEMBANG
title_fullStr STUDY OF PASSENGER TRAVEL DEMAND IN CABLE CAR CONSTRUCTION SEGMENT STATION HALL-LEMBANG
title_full_unstemmed STUDY OF PASSENGER TRAVEL DEMAND IN CABLE CAR CONSTRUCTION SEGMENT STATION HALL-LEMBANG
title_sort study of passenger travel demand in cable car construction segment station hall-lembang
url https://digilib.itb.ac.id/gdl/view/18691
_version_ 1820745955165601792