FINANCIAL FEASIBLE ANALYSIS OF CISUMDAWU (CILEUNYI SUMEDANG DAWUAN) TOLL ROADS CONSTRUCTION PROJECT

West Java, a province which has the largest number of population in Indonesia, has the highest level of transportation demand of passengers and commodities. There is one of Government plans that aimed to increase the infrastructure of transportation by constructing Cisumdawu toll road which connects...

Full description

Saved in:
Bibliographic Details
Main Author: AWANG SUKMA (NIM : 15005019); Dosen Pembimbing : Dr. Harmein Rahman ST. MT., ARANDA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18746
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:18746
spelling id-itb.:187462017-09-27T10:25:47ZFINANCIAL FEASIBLE ANALYSIS OF CISUMDAWU (CILEUNYI SUMEDANG DAWUAN) TOLL ROADS CONSTRUCTION PROJECT AWANG SUKMA (NIM : 15005019); Dosen Pembimbing : Dr. Harmein Rahman ST. MT., ARANDA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18746 West Java, a province which has the largest number of population in Indonesia, has the highest level of transportation demand of passengers and commodities. There is one of Government plans that aimed to increase the infrastructure of transportation by constructing Cisumdawu toll road which connects Bandung regency with Sumedang regency and Majalengka regency. <br /> <br /> <br /> The objective of this final project is to analyze the feasibility of Cisandawu toll road construction project that will be operated in 2016. The analysis is begun with counting the numbers of vehicles that will run through toll road. The analysis assisted by SATURN software program. The program is used to simulate the choice of route which chosen by the driver because of toll road networks was added on national and province roads network system that have been exist before. <br /> <br /> <br /> The last process of this final project is the financial analysis that is based on total benefit of income projection from toll operation along with total cost of outcome projection from construction and operation of Cisumdawu toll road. Based on discount rate 12%,it can be concluded that the construction project of Cisumdawu toll road has NPV for Rp 1.855.539.000.00,00 with value of BCR 1,13 and the value of IRR 14%. Thus, this project can be categorized feasible by financial. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description West Java, a province which has the largest number of population in Indonesia, has the highest level of transportation demand of passengers and commodities. There is one of Government plans that aimed to increase the infrastructure of transportation by constructing Cisumdawu toll road which connects Bandung regency with Sumedang regency and Majalengka regency. <br /> <br /> <br /> The objective of this final project is to analyze the feasibility of Cisandawu toll road construction project that will be operated in 2016. The analysis is begun with counting the numbers of vehicles that will run through toll road. The analysis assisted by SATURN software program. The program is used to simulate the choice of route which chosen by the driver because of toll road networks was added on national and province roads network system that have been exist before. <br /> <br /> <br /> The last process of this final project is the financial analysis that is based on total benefit of income projection from toll operation along with total cost of outcome projection from construction and operation of Cisumdawu toll road. Based on discount rate 12%,it can be concluded that the construction project of Cisumdawu toll road has NPV for Rp 1.855.539.000.00,00 with value of BCR 1,13 and the value of IRR 14%. Thus, this project can be categorized feasible by financial.
format Final Project
author AWANG SUKMA (NIM : 15005019); Dosen Pembimbing : Dr. Harmein Rahman ST. MT., ARANDA
spellingShingle AWANG SUKMA (NIM : 15005019); Dosen Pembimbing : Dr. Harmein Rahman ST. MT., ARANDA
FINANCIAL FEASIBLE ANALYSIS OF CISUMDAWU (CILEUNYI SUMEDANG DAWUAN) TOLL ROADS CONSTRUCTION PROJECT
author_facet AWANG SUKMA (NIM : 15005019); Dosen Pembimbing : Dr. Harmein Rahman ST. MT., ARANDA
author_sort AWANG SUKMA (NIM : 15005019); Dosen Pembimbing : Dr. Harmein Rahman ST. MT., ARANDA
title FINANCIAL FEASIBLE ANALYSIS OF CISUMDAWU (CILEUNYI SUMEDANG DAWUAN) TOLL ROADS CONSTRUCTION PROJECT
title_short FINANCIAL FEASIBLE ANALYSIS OF CISUMDAWU (CILEUNYI SUMEDANG DAWUAN) TOLL ROADS CONSTRUCTION PROJECT
title_full FINANCIAL FEASIBLE ANALYSIS OF CISUMDAWU (CILEUNYI SUMEDANG DAWUAN) TOLL ROADS CONSTRUCTION PROJECT
title_fullStr FINANCIAL FEASIBLE ANALYSIS OF CISUMDAWU (CILEUNYI SUMEDANG DAWUAN) TOLL ROADS CONSTRUCTION PROJECT
title_full_unstemmed FINANCIAL FEASIBLE ANALYSIS OF CISUMDAWU (CILEUNYI SUMEDANG DAWUAN) TOLL ROADS CONSTRUCTION PROJECT
title_sort financial feasible analysis of cisumdawu (cileunyi sumedang dawuan) toll roads construction project
url https://digilib.itb.ac.id/gdl/view/18746
_version_ 1821119624746369024