FINANCIAL FEASIBLE ANALYSIS OF CISUMDAWU (CILEUNYI SUMEDANG DAWUAN) TOLL ROADS CONSTRUCTION PROJECT
West Java, a province which has the largest number of population in Indonesia, has the highest level of transportation demand of passengers and commodities. There is one of Government plans that aimed to increase the infrastructure of transportation by constructing Cisumdawu toll road which connects...
Saved in:
Main Author: | AWANG SUKMA (NIM : 15005019); Dosen Pembimbing : Dr. Harmein Rahman ST. MT., ARANDA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18746 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ROAD SAFETY INVESTIGATION IN PADALARANG-CILEUNYI TOLL ROAD
by: EKA PUTRA (NIM : 15006155); Pembimbing : Aine Kusumawati, ST, MT, PhD, RIDHO -
A STUDY OF TOLL ROAD INVESTMENT RISK FROM VIEWPOINT OF GEOTECHNICAL PROBLEM ON SOIL PILES (A Case Study of Cipularang and Cisumdawu Toll Roads)
by: SUKARNO (NIM : 25003053); Pembimbing : DR. Ir. Ilyas Suratman, CES, DEA., ASEP -
A STUDY OF APPLICATION ON NPV-AT-RISK MODEL AS A TOOL FOR INVESTMENT EVALUATION IN TOLL ROAD INFRASTRUCTURE PROJECT (CASE STUDY: THE DEVELOPMENT OF CISUMDAWU TOLL ROAD)
by: FITRIANI (NIM : 250 03 061); Pembimbing : Dr. Ir. Puti Farida Marzuki; Dr. Ing Andreas Wibowo, HENI -
ASSESSMENT OF FIELD DENSITY TESTS AND COMPACTION CHARACTERISTICS OF SOIL ON PADALARANG - CILEUNYI TOLL ROAD PROJECT
by: Utoyo Moeno, Hadi -
SETTLEMENT OF BANDUNG CLAY UNDER TRIAL EMBANKMENT LOADING FOR THE PADALARANG-CILEUNYI TOLL HIGHWAY
by: Hari Wilopo, Didik