#TITLE_ALTERNATIVE#
Anambas region consisting of small islands, has a problem in interisland transportation. Interisland bridge construction is expected to be an alternative solution to the problem of sea transport that is not effective and efficient. In planning interisland bridge construction, information about featu...
Saved in:
Main Author: | M RICY ISMAIL (NIM : 15110016) ; Pembimbing I : Dr. Ir. Dwi Wisayantono, MT. ; Pembimbing II : Dr. |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18948 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: REZA DWI ATMAJA (NIM : 15108100) ; Pembimbing I : Dr. Ir. Dwi Wisayantono, MT ; Pembimbing II, ACHMAD -
#TITLE_ALTERNATIVE#
by: ISMAIL (NIM 15104060); Pembimbing : Dr. Deni Suwardhi, ST., MT. dan Ir. Dwi Wisayantono MT., YONAN -
#TITLE_ALTERNATIVE#
by: (NIM 15108061); Pembimbing: Dr. Ir. Irdam Adil, MT dan Dr. Ir. Dwi Wisayantono, MT, SAMUEL -
#TITLE_ALTERNATIVE#
by: (NIM 15107038); Pembimbing: Dr. rer.nat. Poerbandono dan Dr.Ir. Dwi Wisayantono, M.T., RIVANDO -
#TITLE_ALTERNATIVE#
by: WICAKSONO (NIM: 15109045); Pembimbing : Dr. Ir. Dwi Wisayantono, M.T. ; Ir. Didik Wihardi W. S, PANDU