EVALUATION OF TOLL GATE AND RAMP PERFORMANCE CASE STUDY : BOGOR TOLL GATE

Toll road was built in order to minimize the disparities between region. Toll gate and ramp are part of toll road wich have an important role to control the toll road inflow and outflow. The purpose of this research is evaluating the toll gate and ramp performance <br /> <br /> <br...

Full description

Saved in:
Bibliographic Details
Main Author: MUHAMMAD ARIEF WICAKSONO (NIM : 15007058);
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/18973
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:18973
spelling id-itb.:189732017-09-27T10:25:49ZEVALUATION OF TOLL GATE AND RAMP PERFORMANCE CASE STUDY : BOGOR TOLL GATE MUHAMMAD ARIEF WICAKSONO (NIM : 15007058); , Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/18973 Toll road was built in order to minimize the disparities between region. Toll gate and ramp are part of toll road wich have an important role to control the toll road inflow and outflow. The purpose of this research is evaluating the toll gate and ramp performance <br /> <br /> <br /> The location of the study is Bogor Toll gate along with it’s ramp. The secondary data were obtained from PT Jasa Marga (Persero) Jagorawi Branch office and the Bogor toll gate office. The secondary data included, geometric data, hourly traffic volume data for the toll gate, and the AADT data. The primary data. collected by fleld observation, included gate service time, exit and entry traffic, and also the traffic at the non-toll terminal data. <br /> <br /> <br /> The toll gate and ramp evaluation was done by assesing the performance of the geometric, service time, queuing in the toll gate and the traffic flow in the ramp. <br /> <br /> <br /> The result showed that the service time at the manual entrance toll booth is 1.54 second/vehicle and at automatic entrance toll booth is 4 second/vehicle, these value were smaller than the standard service time for the closed system set out ini SPM, wich is 7 second/vehicle. The service time at the exit toll booth is 7.54 second/vehicle, this value is also smaller than standard service time for the closed system exit toll booth, wich is 8 second/vehicle. The Bogor toll gate and ramp, is fulfilled the geometric standard. The analysis of queuing result no queue in the toll gate and it’s ramp. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Toll road was built in order to minimize the disparities between region. Toll gate and ramp are part of toll road wich have an important role to control the toll road inflow and outflow. The purpose of this research is evaluating the toll gate and ramp performance <br /> <br /> <br /> The location of the study is Bogor Toll gate along with it’s ramp. The secondary data were obtained from PT Jasa Marga (Persero) Jagorawi Branch office and the Bogor toll gate office. The secondary data included, geometric data, hourly traffic volume data for the toll gate, and the AADT data. The primary data. collected by fleld observation, included gate service time, exit and entry traffic, and also the traffic at the non-toll terminal data. <br /> <br /> <br /> The toll gate and ramp evaluation was done by assesing the performance of the geometric, service time, queuing in the toll gate and the traffic flow in the ramp. <br /> <br /> <br /> The result showed that the service time at the manual entrance toll booth is 1.54 second/vehicle and at automatic entrance toll booth is 4 second/vehicle, these value were smaller than the standard service time for the closed system set out ini SPM, wich is 7 second/vehicle. The service time at the exit toll booth is 7.54 second/vehicle, this value is also smaller than standard service time for the closed system exit toll booth, wich is 8 second/vehicle. The Bogor toll gate and ramp, is fulfilled the geometric standard. The analysis of queuing result no queue in the toll gate and it’s ramp.
format Final Project
author MUHAMMAD ARIEF WICAKSONO (NIM : 15007058); ,
spellingShingle MUHAMMAD ARIEF WICAKSONO (NIM : 15007058); ,
EVALUATION OF TOLL GATE AND RAMP PERFORMANCE CASE STUDY : BOGOR TOLL GATE
author_facet MUHAMMAD ARIEF WICAKSONO (NIM : 15007058); ,
author_sort MUHAMMAD ARIEF WICAKSONO (NIM : 15007058); ,
title EVALUATION OF TOLL GATE AND RAMP PERFORMANCE CASE STUDY : BOGOR TOLL GATE
title_short EVALUATION OF TOLL GATE AND RAMP PERFORMANCE CASE STUDY : BOGOR TOLL GATE
title_full EVALUATION OF TOLL GATE AND RAMP PERFORMANCE CASE STUDY : BOGOR TOLL GATE
title_fullStr EVALUATION OF TOLL GATE AND RAMP PERFORMANCE CASE STUDY : BOGOR TOLL GATE
title_full_unstemmed EVALUATION OF TOLL GATE AND RAMP PERFORMANCE CASE STUDY : BOGOR TOLL GATE
title_sort evaluation of toll gate and ramp performance case study : bogor toll gate
url https://digilib.itb.ac.id/gdl/view/18973
_version_ 1821119696546562048