COMPARISON OF CONSTRUCTION COST ANALYSIS OF JOINTED REINFORCED CONCRETE PAVEMENT AND PRECAST-PRETRESSED CONCRETE PAVEMENT CASE STUDY KANCI PEJAGAN TOLL ROAD
In this Final Project conducted a comparative study of the method of precast prestressed concrete pavement which is the innovational technologi of new pavement in Indonesia ,and the methods of Rigid Concrete Pavement conventional (RCP) viewed in terms of cost. This final case study is a toll road pr...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/18989 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |