THE STUDY OF EARNED VALUE MANAGEMENT SYSTEM (EVMS) DEVELOPMENT POTENTIAL FOR SMALL CONTRACTORS COST ACCOUNTING SYSTEM

Cost and time planning and controlling are part of construction project management. Earned value concept is a concept that can be used to manage a construction project with integration of cost and time constraints. The practice of Indonesian contractors for construction project management has not a...

Full description

Saved in:
Bibliographic Details
Main Author: PUJOARTANTO (NIM 25005017); Pembimbing: Ir. Biemo W. Soemardi, MSE., Ph.D., NURUDDIN
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/19093
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:19093
spelling id-itb.:190932017-09-27T15:23:33ZTHE STUDY OF EARNED VALUE MANAGEMENT SYSTEM (EVMS) DEVELOPMENT POTENTIAL FOR SMALL CONTRACTORS COST ACCOUNTING SYSTEM PUJOARTANTO (NIM 25005017); Pembimbing: Ir. Biemo W. Soemardi, MSE., Ph.D., NURUDDIN Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/19093 Cost and time planning and controlling are part of construction project management. Earned value concept is a concept that can be used to manage a construction project with integration of cost and time constraints. The practice of Indonesian contractors for construction project management has not applied whole of Earned Value Management System (EVMS) criteria. Project management software application also has not applied optimally especially for application of earned value concept for project control. <br /> <br /> <br /> This Research aimed at investigating the potential application of EVMS application for small contractor accounting project system. Result of this investigation was then be used for development of project accounting system and measurement of project performance with earned value concept using simple spreadsheet application. <br /> <br /> <br /> Based on the result of this research, it was found that average measurement of small contractors project accounting system is 71,6%. This value means that accounting function as part of cost control system has been applied at more than half by small contractors. Based on this value, it can be concluded that the development of project accounting system for small contractors is potential. Further this research suggests the priority for development of project accounting system for small contractors, which are system improvement for strong tracking system, establishment of accounting procedures, fast and easy data availibity. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Cost and time planning and controlling are part of construction project management. Earned value concept is a concept that can be used to manage a construction project with integration of cost and time constraints. The practice of Indonesian contractors for construction project management has not applied whole of Earned Value Management System (EVMS) criteria. Project management software application also has not applied optimally especially for application of earned value concept for project control. <br /> <br /> <br /> This Research aimed at investigating the potential application of EVMS application for small contractor accounting project system. Result of this investigation was then be used for development of project accounting system and measurement of project performance with earned value concept using simple spreadsheet application. <br /> <br /> <br /> Based on the result of this research, it was found that average measurement of small contractors project accounting system is 71,6%. This value means that accounting function as part of cost control system has been applied at more than half by small contractors. Based on this value, it can be concluded that the development of project accounting system for small contractors is potential. Further this research suggests the priority for development of project accounting system for small contractors, which are system improvement for strong tracking system, establishment of accounting procedures, fast and easy data availibity. <br />
format Theses
author PUJOARTANTO (NIM 25005017); Pembimbing: Ir. Biemo W. Soemardi, MSE., Ph.D., NURUDDIN
spellingShingle PUJOARTANTO (NIM 25005017); Pembimbing: Ir. Biemo W. Soemardi, MSE., Ph.D., NURUDDIN
THE STUDY OF EARNED VALUE MANAGEMENT SYSTEM (EVMS) DEVELOPMENT POTENTIAL FOR SMALL CONTRACTORS COST ACCOUNTING SYSTEM
author_facet PUJOARTANTO (NIM 25005017); Pembimbing: Ir. Biemo W. Soemardi, MSE., Ph.D., NURUDDIN
author_sort PUJOARTANTO (NIM 25005017); Pembimbing: Ir. Biemo W. Soemardi, MSE., Ph.D., NURUDDIN
title THE STUDY OF EARNED VALUE MANAGEMENT SYSTEM (EVMS) DEVELOPMENT POTENTIAL FOR SMALL CONTRACTORS COST ACCOUNTING SYSTEM
title_short THE STUDY OF EARNED VALUE MANAGEMENT SYSTEM (EVMS) DEVELOPMENT POTENTIAL FOR SMALL CONTRACTORS COST ACCOUNTING SYSTEM
title_full THE STUDY OF EARNED VALUE MANAGEMENT SYSTEM (EVMS) DEVELOPMENT POTENTIAL FOR SMALL CONTRACTORS COST ACCOUNTING SYSTEM
title_fullStr THE STUDY OF EARNED VALUE MANAGEMENT SYSTEM (EVMS) DEVELOPMENT POTENTIAL FOR SMALL CONTRACTORS COST ACCOUNTING SYSTEM
title_full_unstemmed THE STUDY OF EARNED VALUE MANAGEMENT SYSTEM (EVMS) DEVELOPMENT POTENTIAL FOR SMALL CONTRACTORS COST ACCOUNTING SYSTEM
title_sort study of earned value management system (evms) development potential for small contractors cost accounting system
url https://digilib.itb.ac.id/gdl/view/19093
_version_ 1821119732007305216