THE STUDY OF EARNED VALUE MANAGEMENT SYSTEM (EVMS) DEVELOPMENT POTENTIAL FOR SMALL CONTRACTORS COST ACCOUNTING SYSTEM
Cost and time planning and controlling are part of construction project management. Earned value concept is a concept that can be used to manage a construction project with integration of cost and time constraints. The practice of Indonesian contractors for construction project management has not a...
Saved in:
Main Author: | PUJOARTANTO (NIM 25005017); Pembimbing: Ir. Biemo W. Soemardi, MSE., Ph.D., NURUDDIN |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19093 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
THE STUDY ON CONSTRUCTION PROJECTS INDIRECT COST COMPONENT COST ESTIMATING PRACTICES IN BY MEDIUM-SIZE CONTRACTORS IN BANDUNG AND JAKARTA
by: RAHADIAN (NIM : 25008011); Pembimbing ; Ir. Biemo W. Soemardi, MSE., Ph. D, DONY -
STUDY ON CONSTRUCTION PROJECTS INDIRECT COST ESTIMATING PRACTICES BY ON LARGE CONTRACTORS IN JAKARTA AND BANDUNG
by: YUSUF (NIM : 250 08 014); Dosen Pembimbing, Ir. Biemo W. Soemardi, MSE., Ph.D., DIANA -
Decentralized renewable energy futures trading on EVM blockchains
by: Ho, Phi Dung
Published: (2024) -
MODEL DEVELOPMENT OF READINEES ASSESSMENT OF LOCAL CONTRACTORS IN ACTIVITY MRT JAKARTA TUNNELING PROJECT
by: PRIHATIN (NIM : 25 007 307); Dosen Pembimbing : Ir. Biemo W. Soemardi, Ph.D, YULIA -
DefectChecker: Automated smart contract defect detection by analyzing EVM bytecode
by: CHEN, Jiachi, et al.
Published: (2022)