WORKLOAD ANALYSIS FOR PLANNING NEEDS OF EMPLOYEES IN THE CORPORATE ADMINISTRATION UNIT PT TIMAH (Persero) Tbk

ABSTRACT <br /> <br /> <br /> <br /> PT Timah (Persero) Tbk is a leading exporter of tin as well as the largest mining company in the world. As the industry competition is so tight, the company seeks to strengthen business strategies by optimizing production. Productio...

Full description

Saved in:
Bibliographic Details
Main Author: HUTAGALUNG (NIM. 29111433); Pembimbing : Dr. Aurik Gustomo, ST, MT, RENNY
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/19269
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:19269
spelling id-itb.:192692017-09-27T15:31:14ZWORKLOAD ANALYSIS FOR PLANNING NEEDS OF EMPLOYEES IN THE CORPORATE ADMINISTRATION UNIT PT TIMAH (Persero) Tbk HUTAGALUNG (NIM. 29111433); Pembimbing : Dr. Aurik Gustomo, ST, MT, RENNY Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/19269 ABSTRACT <br /> <br /> <br /> <br /> PT Timah (Persero) Tbk is a leading exporter of tin as well as the largest mining company in the world. As the industry competition is so tight, the company seeks to strengthen business strategies by optimizing production. Production optimization for efficiency and effectiveness of the company is done by determining the exact number of employees. <br /> <br /> <br /> <br /> The final project is focused on workload measurement to determine the number of employees needed by the company. The method used is the method of work <br /> <br /> <br /> sampling. Observations were made at intervals of several employees. The final project is focused on employees in the work unit Corporate Administration. <br /> <br /> <br /> <br /> After analyzing the workload of the employees in the administrative unit company PT Timah (Persero) Tbk, there are differences in productivity among employees, which led to the workload among employees is uneven. Optimal number of employees working unit only 40 administrative Company employees. This means <br /> <br /> <br /> <br /> that the number of employees in the administrative unit company with 40 employees enough. Thus, the efficiency needs to be done by reducing the number of employees. <br /> <br /> <br /> <br /> KEYWORDS : Man Power Planning, Workload, Work Sampling text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description ABSTRACT <br /> <br /> <br /> <br /> PT Timah (Persero) Tbk is a leading exporter of tin as well as the largest mining company in the world. As the industry competition is so tight, the company seeks to strengthen business strategies by optimizing production. Production optimization for efficiency and effectiveness of the company is done by determining the exact number of employees. <br /> <br /> <br /> <br /> The final project is focused on workload measurement to determine the number of employees needed by the company. The method used is the method of work <br /> <br /> <br /> sampling. Observations were made at intervals of several employees. The final project is focused on employees in the work unit Corporate Administration. <br /> <br /> <br /> <br /> After analyzing the workload of the employees in the administrative unit company PT Timah (Persero) Tbk, there are differences in productivity among employees, which led to the workload among employees is uneven. Optimal number of employees working unit only 40 administrative Company employees. This means <br /> <br /> <br /> <br /> that the number of employees in the administrative unit company with 40 employees enough. Thus, the efficiency needs to be done by reducing the number of employees. <br /> <br /> <br /> <br /> KEYWORDS : Man Power Planning, Workload, Work Sampling
format Theses
author HUTAGALUNG (NIM. 29111433); Pembimbing : Dr. Aurik Gustomo, ST, MT, RENNY
spellingShingle HUTAGALUNG (NIM. 29111433); Pembimbing : Dr. Aurik Gustomo, ST, MT, RENNY
WORKLOAD ANALYSIS FOR PLANNING NEEDS OF EMPLOYEES IN THE CORPORATE ADMINISTRATION UNIT PT TIMAH (Persero) Tbk
author_facet HUTAGALUNG (NIM. 29111433); Pembimbing : Dr. Aurik Gustomo, ST, MT, RENNY
author_sort HUTAGALUNG (NIM. 29111433); Pembimbing : Dr. Aurik Gustomo, ST, MT, RENNY
title WORKLOAD ANALYSIS FOR PLANNING NEEDS OF EMPLOYEES IN THE CORPORATE ADMINISTRATION UNIT PT TIMAH (Persero) Tbk
title_short WORKLOAD ANALYSIS FOR PLANNING NEEDS OF EMPLOYEES IN THE CORPORATE ADMINISTRATION UNIT PT TIMAH (Persero) Tbk
title_full WORKLOAD ANALYSIS FOR PLANNING NEEDS OF EMPLOYEES IN THE CORPORATE ADMINISTRATION UNIT PT TIMAH (Persero) Tbk
title_fullStr WORKLOAD ANALYSIS FOR PLANNING NEEDS OF EMPLOYEES IN THE CORPORATE ADMINISTRATION UNIT PT TIMAH (Persero) Tbk
title_full_unstemmed WORKLOAD ANALYSIS FOR PLANNING NEEDS OF EMPLOYEES IN THE CORPORATE ADMINISTRATION UNIT PT TIMAH (Persero) Tbk
title_sort workload analysis for planning needs of employees in the corporate administration unit pt timah (persero) tbk
url https://digilib.itb.ac.id/gdl/view/19269
_version_ 1821119787445518336