WATER RESOURCE POTENCIAL ANALYSIS FOR THE CONSTRUCTION OF MICROHYDRO POWER PLANT IN ITB JATINANGOR

In the development of the new campus of Institut Teknologi Bandung in Jatinangor, there will be several nature laboratory created. One of the laboratory under construction is water reservoir utilizing the previously constructed weir. It is such a waste to let the water flowing this weir without util...

Full description

Saved in:
Bibliographic Details
Main Author: DAISKA WINARDI (NIM : 15007022); Dosen Pembimbing : Dr. Ir. Dhemi Harlan., M.Sc, RHEZA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/19298
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:19298
spelling id-itb.:192982017-09-27T10:25:48ZWATER RESOURCE POTENCIAL ANALYSIS FOR THE CONSTRUCTION OF MICROHYDRO POWER PLANT IN ITB JATINANGOR DAISKA WINARDI (NIM : 15007022); Dosen Pembimbing : Dr. Ir. Dhemi Harlan., M.Sc, RHEZA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/19298 In the development of the new campus of Institut Teknologi Bandung in Jatinangor, there will be several nature laboratory created. One of the laboratory under construction is water reservoir utilizing the previously constructed weir. It is such a waste to let the water flowing this weir without utilized it, for example as <br /> <br /> <br /> a electricity resource. In this papers, there will be some process to calculate the dependable discharge that have the optimum value for power plant construction. The process start with frequency analysis for the design of the weir. There are also calculation for possibility of evapotranspiration using the Penman Modification method and finally the number generated from the evapotranspiration calculation will be used for the calculation of dependable discharge using F.J. Mock method. The value of dependable discharge from previous calculation will be optimized base on probability and the value of electricity aproduced. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In the development of the new campus of Institut Teknologi Bandung in Jatinangor, there will be several nature laboratory created. One of the laboratory under construction is water reservoir utilizing the previously constructed weir. It is such a waste to let the water flowing this weir without utilized it, for example as <br /> <br /> <br /> a electricity resource. In this papers, there will be some process to calculate the dependable discharge that have the optimum value for power plant construction. The process start with frequency analysis for the design of the weir. There are also calculation for possibility of evapotranspiration using the Penman Modification method and finally the number generated from the evapotranspiration calculation will be used for the calculation of dependable discharge using F.J. Mock method. The value of dependable discharge from previous calculation will be optimized base on probability and the value of electricity aproduced.
format Final Project
author DAISKA WINARDI (NIM : 15007022); Dosen Pembimbing : Dr. Ir. Dhemi Harlan., M.Sc, RHEZA
spellingShingle DAISKA WINARDI (NIM : 15007022); Dosen Pembimbing : Dr. Ir. Dhemi Harlan., M.Sc, RHEZA
WATER RESOURCE POTENCIAL ANALYSIS FOR THE CONSTRUCTION OF MICROHYDRO POWER PLANT IN ITB JATINANGOR
author_facet DAISKA WINARDI (NIM : 15007022); Dosen Pembimbing : Dr. Ir. Dhemi Harlan., M.Sc, RHEZA
author_sort DAISKA WINARDI (NIM : 15007022); Dosen Pembimbing : Dr. Ir. Dhemi Harlan., M.Sc, RHEZA
title WATER RESOURCE POTENCIAL ANALYSIS FOR THE CONSTRUCTION OF MICROHYDRO POWER PLANT IN ITB JATINANGOR
title_short WATER RESOURCE POTENCIAL ANALYSIS FOR THE CONSTRUCTION OF MICROHYDRO POWER PLANT IN ITB JATINANGOR
title_full WATER RESOURCE POTENCIAL ANALYSIS FOR THE CONSTRUCTION OF MICROHYDRO POWER PLANT IN ITB JATINANGOR
title_fullStr WATER RESOURCE POTENCIAL ANALYSIS FOR THE CONSTRUCTION OF MICROHYDRO POWER PLANT IN ITB JATINANGOR
title_full_unstemmed WATER RESOURCE POTENCIAL ANALYSIS FOR THE CONSTRUCTION OF MICROHYDRO POWER PLANT IN ITB JATINANGOR
title_sort water resource potencial analysis for the construction of microhydro power plant in itb jatinangor
url https://digilib.itb.ac.id/gdl/view/19298
_version_ 1821119796725415936