KAJIAN PENENTUAN URUTAN PRIORITAS PENANGANAN LAHAN KRITIS STUDI KASUS SUB SUB DAS CIMANUK HULU

The greater critical land growth rate unable to meet balance to the ability of rehabilitating it. So, determining sequence priority on handling of critical land is needed. Forestry Institution conduct it by pursuant to biophysical aspects namely Erosion Danger Level (TBE) to the watershed with eros...

Full description

Saved in:
Bibliographic Details
Main Author: AGUS BUDI SANTOSA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/1961
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:1961
spelling id-itb.:19612005-02-21T15:29:59ZKAJIAN PENENTUAN URUTAN PRIORITAS PENANGANAN LAHAN KRITIS STUDI KASUS SUB SUB DAS CIMANUK HULU AGUS BUDI SANTOSA, Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/1961 The greater critical land growth rate unable to meet balance to the ability of rehabilitating it. So, determining sequence priority on handling of critical land is needed. Forestry Institution conduct it by pursuant to biophysical aspects namely Erosion Danger Level (TBE) to the watershed with erosion and sedimentation as a main problems. The objective of this research is to conduct sequence priority of handling the critical land, by a). dentifying factors that should taken into consideration on making sequence priority of <br /> sequence priority of handling the critical land; and b). conduct sequence priority of handling the critical land using the identified factors above. <br /> According to perception analysis (stakeholder analysis and Delphi Method), experts have a notion the importance of enhanced by adding <br /> social economic aspect using population pressure index and spatial planning aspect using assigned conservation area and crops spatial use. <br /> The merger of three aspects above using geographical information system by ArcView release 3.1. Rank Sum method and Normalization of scale are used to conduct sequence priority, hanging areas and location shifting were occur on new sequence priority which caused by adding two aspects above. <br /> Sequence priority change from 5 to 14 <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The greater critical land growth rate unable to meet balance to the ability of rehabilitating it. So, determining sequence priority on handling of critical land is needed. Forestry Institution conduct it by pursuant to biophysical aspects namely Erosion Danger Level (TBE) to the watershed with erosion and sedimentation as a main problems. The objective of this research is to conduct sequence priority of handling the critical land, by a). dentifying factors that should taken into consideration on making sequence priority of <br /> sequence priority of handling the critical land; and b). conduct sequence priority of handling the critical land using the identified factors above. <br /> According to perception analysis (stakeholder analysis and Delphi Method), experts have a notion the importance of enhanced by adding <br /> social economic aspect using population pressure index and spatial planning aspect using assigned conservation area and crops spatial use. <br /> The merger of three aspects above using geographical information system by ArcView release 3.1. Rank Sum method and Normalization of scale are used to conduct sequence priority, hanging areas and location shifting were occur on new sequence priority which caused by adding two aspects above. <br /> Sequence priority change from 5 to 14 <br />
format Theses
author AGUS BUDI SANTOSA,
spellingShingle AGUS BUDI SANTOSA,
KAJIAN PENENTUAN URUTAN PRIORITAS PENANGANAN LAHAN KRITIS STUDI KASUS SUB SUB DAS CIMANUK HULU
author_facet AGUS BUDI SANTOSA,
author_sort AGUS BUDI SANTOSA,
title KAJIAN PENENTUAN URUTAN PRIORITAS PENANGANAN LAHAN KRITIS STUDI KASUS SUB SUB DAS CIMANUK HULU
title_short KAJIAN PENENTUAN URUTAN PRIORITAS PENANGANAN LAHAN KRITIS STUDI KASUS SUB SUB DAS CIMANUK HULU
title_full KAJIAN PENENTUAN URUTAN PRIORITAS PENANGANAN LAHAN KRITIS STUDI KASUS SUB SUB DAS CIMANUK HULU
title_fullStr KAJIAN PENENTUAN URUTAN PRIORITAS PENANGANAN LAHAN KRITIS STUDI KASUS SUB SUB DAS CIMANUK HULU
title_full_unstemmed KAJIAN PENENTUAN URUTAN PRIORITAS PENANGANAN LAHAN KRITIS STUDI KASUS SUB SUB DAS CIMANUK HULU
title_sort kajian penentuan urutan prioritas penanganan lahan kritis studi kasus sub sub das cimanuk hulu
url https://digilib.itb.ac.id/gdl/view/1961
_version_ 1820663112961884160