PENINGKATAN KINERJA PABRIK COLD ROLLING MILL UNTUK MENINGKATKAN KONTRIBUSI PADA PROFITABILITAS PT KRAKATAU STEEL
ABSTRACT <br /> <br /> <br /> <br /> <br /> <br /> <br /> Management is currently facing a dilemma because among the three products that provide revenue to the company only one that gives good profitability i.e. Hot Rolled Coils (HRC). Cold rolled...
Saved in:
Main Author: | WIRAWAN (NIM: 291100433); Final Project Counselor: Dr.Ir. GatotYudoko, MA.Sc, Ph.D, WAHYU |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19644 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Laporan Pelaksanaan Magang Di PT. Krakatau Steel (Persero) Tbk., Cilegon, Banten: Pelaksanaan Rencana K3 Pada Implementasi Sistem Manajemen Keselamatan Dan Kesehatan Kerja (SMK3) Di Pabrik Cold Rolling Mill PT. Krakatau Steel (Persero) Tbk. Tahun 2018
by: Fatin Zuhra
Published: (2019) -
PENETAPAN KEBIJAKAN DAN PERENCANAAN K3 PADA SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) DI PABRIK COLD ROLLING MILL PT. KRAKATAU STEEL (PERSERO) Tbk. TAHUN 2018
by: GENDUK LINTANG RUSMAWARDA, -
Published: (2019) -
Pengendalian persediaan khusus suku cadang pada Pabrik Hot Strip Mill Krakatau Steel Cilegon
by: , HARTONO, Agus
Published: (1989) -
ANALYSIS AND PROPOSED IMPROVEMENT OF PROCUREMENT STRATEGY IMPLEMENTATION OF PT. KRAKATAU STEEL (PERSERO) Tbk.
by: RUSTANDI LEMAN (NIM: 29110423) Pembimbing : Ir. Gatot Yudoko, MA.Sc, Ph.D., ANDI -
ALIGNING WORKFORCE PLANNING WITH CORPORATE STRATEGY TO INCREASE PRODUCTIVITY CASE STUDY: PT KRAKATAU STEEL (PERSERO),TBK.
by: TARIGAN (NIM: 29110458); Final Project Advisor: Prof. Dr. Ir. Jann Hidajat Tjakraatmaadja, GERSANG