USULAN RANCANGAN PERBAIKAN KINERJA PADA PELAYANAN ADMINISTRASI TENAGA KERJA DI DIVISI TAMBANG PERMUKAAN PTFI
The need for a reliable manpower to support the mining activities at surface mining <br /> <br /> <br /> <br /> <br /> PTFI is very high. The mine plan made needs manpower to support the plan in order that the <br /> <br /> <br /> <br /&...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19715 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:19715 |
---|---|
spelling |
id-itb.:197152017-09-27T15:30:58ZUSULAN RANCANGAN PERBAIKAN KINERJA PADA PELAYANAN ADMINISTRASI TENAGA KERJA DI DIVISI TAMBANG PERMUKAAN PTFI EFFENDDY SUNJOTO (NIM : 29109115), YOHAN Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/19715 The need for a reliable manpower to support the mining activities at surface mining <br /> <br /> <br /> <br /> <br /> PTFI is very high. The mine plan made needs manpower to support the plan in order that the <br /> <br /> <br /> <br /> <br /> plan can be achieved. Without good planning and reliable manpower administration service, <br /> <br /> <br /> <br /> <br /> it will have an impact on providing manpower in the effort to fulfill the mine plan <br /> <br /> <br /> <br /> <br /> (production). <br /> <br /> <br /> <br /> <br /> In terms of manpower services in the surface mine division, each department has <br /> <br /> <br /> <br /> <br /> admin section that responsible in providing the services. With so many departments under the <br /> <br /> <br /> <br /> <br /> division each admin has different result performance service in serving customers. As there <br /> <br /> <br /> <br /> <br /> are still many complaints from customers about the services, it is due to the pattern of each <br /> <br /> <br /> <br /> <br /> admin sections are not integrated and most importantly, the performance management system <br /> <br /> <br /> <br /> <br /> has not been implemented so it does not have performance measurement, accountability and <br /> <br /> <br /> <br /> <br /> performance variables integrating to organization and customer. <br /> <br /> <br /> <br /> <br /> Result of research is to design a performance management system using the steps of <br /> <br /> <br /> <br /> <br /> Integrated Performance Management System (IPMS) framework. The framework is applied <br /> <br /> <br /> <br /> <br /> by using three simple perspectives to determine the performance variable. The perspectives <br /> <br /> <br /> <br /> <br /> are organization output, internal process, and resources which integrated to the organization <br /> <br /> <br /> <br /> <br /> and customer. The design of performance management systems has resulted performance <br /> <br /> <br /> <br /> <br /> variable which related to customer needs which are quality and accuracy service, timeliness <br /> <br /> <br /> <br /> <br /> service and number of service. <br /> <br /> <br /> <br /> <br /> Implementation of the overall performance improvement project starts from the <br /> <br /> <br /> <br /> <br /> design setup of integrated organization development thus the performance management <br /> <br /> <br /> <br /> <br /> system designed can be used to improve the quality of the manpower administration services <br /> <br /> <br /> <br /> <br /> sustainably. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The need for a reliable manpower to support the mining activities at surface mining <br />
<br />
<br />
<br />
<br />
PTFI is very high. The mine plan made needs manpower to support the plan in order that the <br />
<br />
<br />
<br />
<br />
plan can be achieved. Without good planning and reliable manpower administration service, <br />
<br />
<br />
<br />
<br />
it will have an impact on providing manpower in the effort to fulfill the mine plan <br />
<br />
<br />
<br />
<br />
(production). <br />
<br />
<br />
<br />
<br />
In terms of manpower services in the surface mine division, each department has <br />
<br />
<br />
<br />
<br />
admin section that responsible in providing the services. With so many departments under the <br />
<br />
<br />
<br />
<br />
division each admin has different result performance service in serving customers. As there <br />
<br />
<br />
<br />
<br />
are still many complaints from customers about the services, it is due to the pattern of each <br />
<br />
<br />
<br />
<br />
admin sections are not integrated and most importantly, the performance management system <br />
<br />
<br />
<br />
<br />
has not been implemented so it does not have performance measurement, accountability and <br />
<br />
<br />
<br />
<br />
performance variables integrating to organization and customer. <br />
<br />
<br />
<br />
<br />
Result of research is to design a performance management system using the steps of <br />
<br />
<br />
<br />
<br />
Integrated Performance Management System (IPMS) framework. The framework is applied <br />
<br />
<br />
<br />
<br />
by using three simple perspectives to determine the performance variable. The perspectives <br />
<br />
<br />
<br />
<br />
are organization output, internal process, and resources which integrated to the organization <br />
<br />
<br />
<br />
<br />
and customer. The design of performance management systems has resulted performance <br />
<br />
<br />
<br />
<br />
variable which related to customer needs which are quality and accuracy service, timeliness <br />
<br />
<br />
<br />
<br />
service and number of service. <br />
<br />
<br />
<br />
<br />
Implementation of the overall performance improvement project starts from the <br />
<br />
<br />
<br />
<br />
design setup of integrated organization development thus the performance management <br />
<br />
<br />
<br />
<br />
system designed can be used to improve the quality of the manpower administration services <br />
<br />
<br />
<br />
<br />
sustainably. |
format |
Theses |
author |
EFFENDDY SUNJOTO (NIM : 29109115), YOHAN |
spellingShingle |
EFFENDDY SUNJOTO (NIM : 29109115), YOHAN USULAN RANCANGAN PERBAIKAN KINERJA PADA PELAYANAN ADMINISTRASI TENAGA KERJA DI DIVISI TAMBANG PERMUKAAN PTFI |
author_facet |
EFFENDDY SUNJOTO (NIM : 29109115), YOHAN |
author_sort |
EFFENDDY SUNJOTO (NIM : 29109115), YOHAN |
title |
USULAN RANCANGAN PERBAIKAN KINERJA PADA PELAYANAN ADMINISTRASI TENAGA KERJA DI DIVISI TAMBANG PERMUKAAN PTFI |
title_short |
USULAN RANCANGAN PERBAIKAN KINERJA PADA PELAYANAN ADMINISTRASI TENAGA KERJA DI DIVISI TAMBANG PERMUKAAN PTFI |
title_full |
USULAN RANCANGAN PERBAIKAN KINERJA PADA PELAYANAN ADMINISTRASI TENAGA KERJA DI DIVISI TAMBANG PERMUKAAN PTFI |
title_fullStr |
USULAN RANCANGAN PERBAIKAN KINERJA PADA PELAYANAN ADMINISTRASI TENAGA KERJA DI DIVISI TAMBANG PERMUKAAN PTFI |
title_full_unstemmed |
USULAN RANCANGAN PERBAIKAN KINERJA PADA PELAYANAN ADMINISTRASI TENAGA KERJA DI DIVISI TAMBANG PERMUKAAN PTFI |
title_sort |
usulan rancangan perbaikan kinerja pada pelayanan administrasi tenaga kerja di divisi tambang permukaan ptfi |
url |
https://digilib.itb.ac.id/gdl/view/19715 |
_version_ |
1821119925971845120 |