Analysis Of Financial Feasibility Study Reprocessing Sample Table Waste Water Project at Cilacap CFSPP

One of the efficiency improvement program that runs on PLTU Cilacap CFSPP (Coal Fired Steam Power Plant) is the return of waste liquid derived from the sample water table. By using waste water sample table can avoid the lost opportunity for PLTU Cilacap and can also increase income because its utili...

Full description

Saved in:
Bibliographic Details
Main Author: SAPTA ADHITAMA (NIM 23207328); Pembimbing: Prof. Dr. Ngapuli Irmea Sinisuka , ADHITYA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/19799
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:19799
spelling id-itb.:197992017-09-27T15:37:34ZAnalysis Of Financial Feasibility Study Reprocessing Sample Table Waste Water Project at Cilacap CFSPP SAPTA ADHITAMA (NIM 23207328); Pembimbing: Prof. Dr. Ngapuli Irmea Sinisuka , ADHITYA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/19799 One of the efficiency improvement program that runs on PLTU Cilacap CFSPP (Coal Fired Steam Power Plant) is the return of waste liquid derived from the sample water table. By using waste water sample table can avoid the lost opportunity for PLTU Cilacap and can also increase income because its utilization can increase electricity production. In each investment surely always a risk there, so it required a study assessing the feasibility. assessment is reviewed from the aspect of financial reimbursement based on the level of risk and investment. Decision criteria used is Payback Period (PP), Net Present Value (NPV) and Internal Rate of Return (IRR). This study is the 5 main factors that cause the risk of investment. Conditions in the simulation results provide optimistic, Payback Period for 11.72 hours, reaching 107.04% IRR, and NPV of Rp. 460,445,108, ‐ in 10 years. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description One of the efficiency improvement program that runs on PLTU Cilacap CFSPP (Coal Fired Steam Power Plant) is the return of waste liquid derived from the sample water table. By using waste water sample table can avoid the lost opportunity for PLTU Cilacap and can also increase income because its utilization can increase electricity production. In each investment surely always a risk there, so it required a study assessing the feasibility. assessment is reviewed from the aspect of financial reimbursement based on the level of risk and investment. Decision criteria used is Payback Period (PP), Net Present Value (NPV) and Internal Rate of Return (IRR). This study is the 5 main factors that cause the risk of investment. Conditions in the simulation results provide optimistic, Payback Period for 11.72 hours, reaching 107.04% IRR, and NPV of Rp. 460,445,108, ‐ in 10 years.
format Theses
author SAPTA ADHITAMA (NIM 23207328); Pembimbing: Prof. Dr. Ngapuli Irmea Sinisuka , ADHITYA
spellingShingle SAPTA ADHITAMA (NIM 23207328); Pembimbing: Prof. Dr. Ngapuli Irmea Sinisuka , ADHITYA
Analysis Of Financial Feasibility Study Reprocessing Sample Table Waste Water Project at Cilacap CFSPP
author_facet SAPTA ADHITAMA (NIM 23207328); Pembimbing: Prof. Dr. Ngapuli Irmea Sinisuka , ADHITYA
author_sort SAPTA ADHITAMA (NIM 23207328); Pembimbing: Prof. Dr. Ngapuli Irmea Sinisuka , ADHITYA
title Analysis Of Financial Feasibility Study Reprocessing Sample Table Waste Water Project at Cilacap CFSPP
title_short Analysis Of Financial Feasibility Study Reprocessing Sample Table Waste Water Project at Cilacap CFSPP
title_full Analysis Of Financial Feasibility Study Reprocessing Sample Table Waste Water Project at Cilacap CFSPP
title_fullStr Analysis Of Financial Feasibility Study Reprocessing Sample Table Waste Water Project at Cilacap CFSPP
title_full_unstemmed Analysis Of Financial Feasibility Study Reprocessing Sample Table Waste Water Project at Cilacap CFSPP
title_sort analysis of financial feasibility study reprocessing sample table waste water project at cilacap cfspp
url https://digilib.itb.ac.id/gdl/view/19799
_version_ 1821119953453973504