Analysis Of Financial Feasibility Study Reprocessing Sample Table Waste Water Project at Cilacap CFSPP
One of the efficiency improvement program that runs on PLTU Cilacap CFSPP (Coal Fired Steam Power Plant) is the return of waste liquid derived from the sample water table. By using waste water sample table can avoid the lost opportunity for PLTU Cilacap and can also increase income because its utili...
Saved in:
Main Author: | SAPTA ADHITAMA (NIM 23207328); Pembimbing: Prof. Dr. Ngapuli Irmea Sinisuka , ADHITYA |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19799 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
A study on the feasibility of a capacity expansion of a reprocessed gypsum plant
by: Gozo, Augusto A.
Published: (1979) -
Optimal lot sizing model with reprocessing of defective output
by: Estanislao, Eppie V.
Published: (1993) -
ALTERNATIVE ECONOMICS REHABILITATION STUDY HYPOCHLORITE PLANT SYSTEM
by: (NIM: 23207332); Pembimbing: Prof. Dr. Ing. Ir. Ngapuli Irmea Sinisuka, RACHMATSYAH -
Solution-reprocessable microporous polymeric adsorbents for carbon dioxide capture
by: Hu, Zhigang, et al.
Published: (2020) -
#TITLE_ALTERNATIVE#
by: GEDE ALFIANZEN (NIM : 13204039); Pembimbing : Prof. DR. Ir. Ngapuli Irmea Sinisuka, I