WELL OPTIMIZATION ON XA-2 AND XA-S INTEGRATED WITH THE SURFACE AND SUBSURFACE IN THE X GAS FIELD

X gas field producing gas from retrograde gas reservoir, has less than 15 years remaining contract to be completed with rate constraints. Three years from now, plateau rate has to be reached at 61 MMSCFD for whole field and after that rate over 15 MMSCFD as an economic limit has to be reached. Mater...

Full description

Saved in:
Bibliographic Details
Main Author: WAHYUDI (NIM : 22209061), AGUS
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/19836
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia