WELL OPTIMIZATION ON XA-2 AND XA-S INTEGRATED WITH THE SURFACE AND SUBSURFACE IN THE X GAS FIELD
X gas field producing gas from retrograde gas reservoir, has less than 15 years remaining contract to be completed with rate constraints. Three years from now, plateau rate has to be reached at 61 MMSCFD for whole field and after that rate over 15 MMSCFD as an economic limit has to be reached. Mater...
Saved in:
Main Author: | WAHYUDI (NIM : 22209061), AGUS |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19836 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
GAS WELL DELIVERABILITY IN X FIELD BASED ON DATA FIELD
by: PRASETYO (NIM : 12299048), HARI -
INTEGRATED PRODUCTION OPTIMIZATION AT DEPLETED GAS FIELD
by: FAJAR KURNIAWAN (NIM 12204059), IMRON -
GEOMAGNETIC METHOD TO ESTIMATE THE STRUCTURE OF SUBSURFACE FROM GEOTHERMAL FIELD
by: RANDIKA (NIM : 10212046), MUHAMMAD -
Production Optimization Through Surface Facilities Modification in Condensate Gas Field
by: ARBI HALASAN SITORUS (NIM 12204068), RUDY -
GAS LIFT OPTIMIZATION AT K FIELD USING INTEGRATED PRODUCTION MODEL
by: SEPTOPANDUVIYATMO (NIM: 22214022), JUDGE