CONTRACT OF JOB AREA POST TERMINATION
Salawati Block is the one of producing block in the eastern part of Indonesia. This block wich was managed by contract of Join Operating Body JOB between Goverment and Contractor consist of Pertamina (50%) and Partners (50%), will be terminated at 2020. <br /> <br /> The new contract a...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19851 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:19851 |
---|---|
spelling |
id-itb.:198512017-09-27T15:07:43ZCONTRACT OF JOB AREA POST TERMINATION WAHYU WIDHYONO (NIM : 22207006); Pembimbing : DR. Ir. Arsegianto, ALBERTUS Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/19851 Salawati Block is the one of producing block in the eastern part of Indonesia. This block wich was managed by contract of Join Operating Body JOB between Goverment and Contractor consist of Pertamina (50%) and Partners (50%), will be terminated at 2020. <br /> <br /> The new contract after termination will take the existing production as Non Sharable Oil, belonging by Goverment. Thus, the sharable oil should be found by some Prospect and Lead wich were deffinited. <br /> <br /> Assummed that the principal of exponential decline curve was applied in this area, then the estimation of existing oil recovery along 20 years of contrct will be 7,41 MMBO. <br /> <br /> Base on equivelencies of decline parameters to existing structures, the estimation of oil recovery promised 7,36 MMBO for 25 % success ratio and 29.43 MMBO for 100 % <br /> <br /> success ratio. <br /> <br /> The Result of the economic analysist consist of : <br /> <br /> 1. The revenue of Government, Pertamina, and Contractor will increase with the incremental of oil recovery. <br /> <br /> 2. The change of Contract will not significantly change the goverment's revenue. <br /> <br /> 3. If Government will take the maximum revenue, then the Standard PSC contract is the best choise. <br /> <br /> 4. By the interval of IRR number between 11% (@ 38% success ratio) and 47 % (@100 % success ratio), suggested to contractor to take this project, because the average of exploration drilling success ratio in Salawati Block was more than 50 %. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Salawati Block is the one of producing block in the eastern part of Indonesia. This block wich was managed by contract of Join Operating Body JOB between Goverment and Contractor consist of Pertamina (50%) and Partners (50%), will be terminated at 2020. <br />
<br />
The new contract after termination will take the existing production as Non Sharable Oil, belonging by Goverment. Thus, the sharable oil should be found by some Prospect and Lead wich were deffinited. <br />
<br />
Assummed that the principal of exponential decline curve was applied in this area, then the estimation of existing oil recovery along 20 years of contrct will be 7,41 MMBO. <br />
<br />
Base on equivelencies of decline parameters to existing structures, the estimation of oil recovery promised 7,36 MMBO for 25 % success ratio and 29.43 MMBO for 100 % <br />
<br />
success ratio. <br />
<br />
The Result of the economic analysist consist of : <br />
<br />
1. The revenue of Government, Pertamina, and Contractor will increase with the incremental of oil recovery. <br />
<br />
2. The change of Contract will not significantly change the goverment's revenue. <br />
<br />
3. If Government will take the maximum revenue, then the Standard PSC contract is the best choise. <br />
<br />
4. By the interval of IRR number between 11% (@ 38% success ratio) and 47 % (@100 % success ratio), suggested to contractor to take this project, because the average of exploration drilling success ratio in Salawati Block was more than 50 %. |
format |
Theses |
author |
WAHYU WIDHYONO (NIM : 22207006); Pembimbing : DR. Ir. Arsegianto, ALBERTUS |
spellingShingle |
WAHYU WIDHYONO (NIM : 22207006); Pembimbing : DR. Ir. Arsegianto, ALBERTUS CONTRACT OF JOB AREA POST TERMINATION |
author_facet |
WAHYU WIDHYONO (NIM : 22207006); Pembimbing : DR. Ir. Arsegianto, ALBERTUS |
author_sort |
WAHYU WIDHYONO (NIM : 22207006); Pembimbing : DR. Ir. Arsegianto, ALBERTUS |
title |
CONTRACT OF JOB AREA POST TERMINATION |
title_short |
CONTRACT OF JOB AREA POST TERMINATION |
title_full |
CONTRACT OF JOB AREA POST TERMINATION |
title_fullStr |
CONTRACT OF JOB AREA POST TERMINATION |
title_full_unstemmed |
CONTRACT OF JOB AREA POST TERMINATION |
title_sort |
contract of job area post termination |
url |
https://digilib.itb.ac.id/gdl/view/19851 |
_version_ |
1821119969688027136 |