CONTRACT OF JOB AREA POST TERMINATION

Salawati Block is the one of producing block in the eastern part of Indonesia. This block wich was managed by contract of Join Operating Body JOB between Goverment and Contractor consist of Pertamina (50%) and Partners (50%), will be terminated at 2020. <br /> <br /> The new contract a...

Full description

Saved in:
Bibliographic Details
Main Author: WAHYU WIDHYONO (NIM : 22207006); Pembimbing : DR. Ir. Arsegianto, ALBERTUS
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/19851
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:19851
spelling id-itb.:198512017-09-27T15:07:43ZCONTRACT OF JOB AREA POST TERMINATION WAHYU WIDHYONO (NIM : 22207006); Pembimbing : DR. Ir. Arsegianto, ALBERTUS Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/19851 Salawati Block is the one of producing block in the eastern part of Indonesia. This block wich was managed by contract of Join Operating Body JOB between Goverment and Contractor consist of Pertamina (50%) and Partners (50%), will be terminated at 2020. <br /> <br /> The new contract after termination will take the existing production as Non Sharable Oil, belonging by Goverment. Thus, the sharable oil should be found by some Prospect and Lead wich were deffinited. <br /> <br /> Assummed that the principal of exponential decline curve was applied in this area, then the estimation of existing oil recovery along 20 years of contrct will be 7,41 MMBO. <br /> <br /> Base on equivelencies of decline parameters to existing structures, the estimation of oil recovery promised 7,36 MMBO for 25 % success ratio and 29.43 MMBO for 100 % <br /> <br /> success ratio. <br /> <br /> The Result of the economic analysist consist of : <br /> <br /> 1. The revenue of Government, Pertamina, and Contractor will increase with the incremental of oil recovery. <br /> <br /> 2. The change of Contract will not significantly change the goverment's revenue. <br /> <br /> 3. If Government will take the maximum revenue, then the Standard PSC contract is the best choise. <br /> <br /> 4. By the interval of IRR number between 11% (@ 38% success ratio) and 47 % (@100 % success ratio), suggested to contractor to take this project, because the average of exploration drilling success ratio in Salawati Block was more than 50 %. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Salawati Block is the one of producing block in the eastern part of Indonesia. This block wich was managed by contract of Join Operating Body JOB between Goverment and Contractor consist of Pertamina (50%) and Partners (50%), will be terminated at 2020. <br /> <br /> The new contract after termination will take the existing production as Non Sharable Oil, belonging by Goverment. Thus, the sharable oil should be found by some Prospect and Lead wich were deffinited. <br /> <br /> Assummed that the principal of exponential decline curve was applied in this area, then the estimation of existing oil recovery along 20 years of contrct will be 7,41 MMBO. <br /> <br /> Base on equivelencies of decline parameters to existing structures, the estimation of oil recovery promised 7,36 MMBO for 25 % success ratio and 29.43 MMBO for 100 % <br /> <br /> success ratio. <br /> <br /> The Result of the economic analysist consist of : <br /> <br /> 1. The revenue of Government, Pertamina, and Contractor will increase with the incremental of oil recovery. <br /> <br /> 2. The change of Contract will not significantly change the goverment's revenue. <br /> <br /> 3. If Government will take the maximum revenue, then the Standard PSC contract is the best choise. <br /> <br /> 4. By the interval of IRR number between 11% (@ 38% success ratio) and 47 % (@100 % success ratio), suggested to contractor to take this project, because the average of exploration drilling success ratio in Salawati Block was more than 50 %.
format Theses
author WAHYU WIDHYONO (NIM : 22207006); Pembimbing : DR. Ir. Arsegianto, ALBERTUS
spellingShingle WAHYU WIDHYONO (NIM : 22207006); Pembimbing : DR. Ir. Arsegianto, ALBERTUS
CONTRACT OF JOB AREA POST TERMINATION
author_facet WAHYU WIDHYONO (NIM : 22207006); Pembimbing : DR. Ir. Arsegianto, ALBERTUS
author_sort WAHYU WIDHYONO (NIM : 22207006); Pembimbing : DR. Ir. Arsegianto, ALBERTUS
title CONTRACT OF JOB AREA POST TERMINATION
title_short CONTRACT OF JOB AREA POST TERMINATION
title_full CONTRACT OF JOB AREA POST TERMINATION
title_fullStr CONTRACT OF JOB AREA POST TERMINATION
title_full_unstemmed CONTRACT OF JOB AREA POST TERMINATION
title_sort contract of job area post termination
url https://digilib.itb.ac.id/gdl/view/19851
_version_ 1821119969688027136