#TITLE_ALTERNATIVE#

Kamojang field is the first geothermal field in Indonesia which have been developed and operated for about 25 years from exploration to production stage. Development through the exploitation can lead the steadiness of mass on fluid system become perturb on the reservoir. Therefore, 4D microgravity m...

Full description

Saved in:
Bibliographic Details
Main Author: PARSAORAN (NIM: 123 04 021), DANIEL
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/19993
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia