#TITLE_ALTERNATIVE#
Kamojang field is the first geothermal field in Indonesia which have been developed and operated for about 25 years from exploration to production stage. Development through the exploitation can lead the steadiness of mass on fluid system become perturb on the reservoir. Therefore, 4D microgravity m...
Saved in:
Main Author: | PARSAORAN (NIM: 123 04 021), DANIEL |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/19993 |