OPTIMITATION PRODUCTION PLAN SELECTION FOR ENGGAL WARAS GAS FIELD IN TERMS OF ECONOMICS
Lapangan Gas Enggal Waras is located at the the eastern of Sulawesi. This field was discovered by EW-1 wildcat well in April 1999. Gas reserve is based on certification of LEMIGAS in December 2009 which is 1.688 Tcf (P1) and 0.23 Tcf (P2) and 1.635 Tcf (90%P1 + 50% P2). Calculation data for Tecnical...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/20174 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:20174 |
---|---|
spelling |
id-itb.:201742017-09-27T15:07:44ZOPTIMITATION PRODUCTION PLAN SELECTION FOR ENGGAL WARAS GAS FIELD IN TERMS OF ECONOMICS MASBUDI (NIM : 22209051); Pembimbing : Dr. Ir. Arsegianto, M.Sc, HERRYADI Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/20174 Lapangan Gas Enggal Waras is located at the the eastern of Sulawesi. This field was discovered by EW-1 wildcat well in April 1999. Gas reserve is based on certification of LEMIGAS in December 2009 which is 1.688 Tcf (P1) and 0.23 Tcf (P2) and 1.635 Tcf (90%P1 + 50% P2). Calculation data for Tecnical evaluation based on drilling and tested well data named EW-1 (1999), EW-2 (2001), EW-3 (2002), EW-4 (2005), EW-5 (2007) dan EW-6 (2009). <br /> <br /> <br /> For the preparation and development scenario election as a POD plan for Enggal Waras Gas Field to BP Migas. it should make an POD evaluation before submitted to BP Migas. dilakukan evaluasi dari aspek keekonomian. To Obtain the best development scenario from the economical aspec, based on technical Evaluation of Enggal Waras development plant. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Lapangan Gas Enggal Waras is located at the the eastern of Sulawesi. This field was discovered by EW-1 wildcat well in April 1999. Gas reserve is based on certification of LEMIGAS in December 2009 which is 1.688 Tcf (P1) and 0.23 Tcf (P2) and 1.635 Tcf (90%P1 + 50% P2). Calculation data for Tecnical evaluation based on drilling and tested well data named EW-1 (1999), EW-2 (2001), EW-3 (2002), EW-4 (2005), EW-5 (2007) dan EW-6 (2009). <br />
<br />
<br />
For the preparation and development scenario election as a POD plan for Enggal Waras Gas Field to BP Migas. it should make an POD evaluation before submitted to BP Migas. dilakukan evaluasi dari aspek keekonomian. To Obtain the best development scenario from the economical aspec, based on technical Evaluation of Enggal Waras development plant. |
format |
Theses |
author |
MASBUDI (NIM : 22209051); Pembimbing : Dr. Ir. Arsegianto, M.Sc, HERRYADI |
spellingShingle |
MASBUDI (NIM : 22209051); Pembimbing : Dr. Ir. Arsegianto, M.Sc, HERRYADI OPTIMITATION PRODUCTION PLAN SELECTION FOR ENGGAL WARAS GAS FIELD IN TERMS OF ECONOMICS |
author_facet |
MASBUDI (NIM : 22209051); Pembimbing : Dr. Ir. Arsegianto, M.Sc, HERRYADI |
author_sort |
MASBUDI (NIM : 22209051); Pembimbing : Dr. Ir. Arsegianto, M.Sc, HERRYADI |
title |
OPTIMITATION PRODUCTION PLAN SELECTION FOR ENGGAL WARAS GAS FIELD IN TERMS OF ECONOMICS |
title_short |
OPTIMITATION PRODUCTION PLAN SELECTION FOR ENGGAL WARAS GAS FIELD IN TERMS OF ECONOMICS |
title_full |
OPTIMITATION PRODUCTION PLAN SELECTION FOR ENGGAL WARAS GAS FIELD IN TERMS OF ECONOMICS |
title_fullStr |
OPTIMITATION PRODUCTION PLAN SELECTION FOR ENGGAL WARAS GAS FIELD IN TERMS OF ECONOMICS |
title_full_unstemmed |
OPTIMITATION PRODUCTION PLAN SELECTION FOR ENGGAL WARAS GAS FIELD IN TERMS OF ECONOMICS |
title_sort |
optimitation production plan selection for enggal waras gas field in terms of economics |
url |
https://digilib.itb.ac.id/gdl/view/20174 |
_version_ |
1821120069848006656 |