A STUDY ON PARTNERSHIP SCHEME AND FINANCIAL FEASIBILITY OF SOREANG SPORT FACILITY DEVELOPMENT
The development of Soreang sport facility in a 74 ha areas is an integrated complex that includes sport, trainee, recreation and commercial activity to accommodate the necessity during city development especially in Soreang regency-Bandung. <br /> <br /> <br /> The rea...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/20275 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:20275 |
---|---|
spelling |
id-itb.:202752017-09-27T15:23:33ZA STUDY ON PARTNERSHIP SCHEME AND FINANCIAL FEASIBILITY OF SOREANG SPORT FACILITY DEVELOPMENT PRIHARYUNINGTYAS (NIM 25005007), MEIRINA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/20275 The development of Soreang sport facility in a 74 ha areas is an integrated complex that includes sport, trainee, recreation and commercial activity to accommodate the necessity during city development especially in Soreang regency-Bandung. <br /> <br /> <br /> The realization of development mostly based on financial budget capability of local government in Bandung. Due to the limited budget, involving investor is necessary to increase the realization of development. To realize the cooperation between investor and government on development and maintenance of the facilities, a study of partnership scheme and financial feasibility is needed. <br /> <br /> <br /> Partnership scheme contracts which are to be observed are Build Transfer (BT), Build Operate Transfer (BOT), Build Lease Transfer (BLT) and Build Transfer Operate (BTO), refer to acquisition land cost and non-acquisition land cost. Financial feasibility then taken to evaluate NPV, BCR and IRR value consider to the selected partnership scheme contract. <br /> <br /> <br /> Based on analyzed result according to cost and revenue assumption for those alternatives, shown that Build Transfer contract with non-acquisition land cost is the feasible and profitable partnership for investor and the government, refer to NPV result which is positive in value and BCR result was greater than one. <br /> <br /> <br /> The sensitivity analyzed then taken for those selected Build Transfer and Build Transfer Operate to indicate the financial loss and benefit for the investor. Through the parameter of construction cost alteration for Build Transfer contract and revenue alteration for Build Transfer Operation contract. <br /> text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The development of Soreang sport facility in a 74 ha areas is an integrated complex that includes sport, trainee, recreation and commercial activity to accommodate the necessity during city development especially in Soreang regency-Bandung. <br />
<br />
<br />
The realization of development mostly based on financial budget capability of local government in Bandung. Due to the limited budget, involving investor is necessary to increase the realization of development. To realize the cooperation between investor and government on development and maintenance of the facilities, a study of partnership scheme and financial feasibility is needed. <br />
<br />
<br />
Partnership scheme contracts which are to be observed are Build Transfer (BT), Build Operate Transfer (BOT), Build Lease Transfer (BLT) and Build Transfer Operate (BTO), refer to acquisition land cost and non-acquisition land cost. Financial feasibility then taken to evaluate NPV, BCR and IRR value consider to the selected partnership scheme contract. <br />
<br />
<br />
Based on analyzed result according to cost and revenue assumption for those alternatives, shown that Build Transfer contract with non-acquisition land cost is the feasible and profitable partnership for investor and the government, refer to NPV result which is positive in value and BCR result was greater than one. <br />
<br />
<br />
The sensitivity analyzed then taken for those selected Build Transfer and Build Transfer Operate to indicate the financial loss and benefit for the investor. Through the parameter of construction cost alteration for Build Transfer contract and revenue alteration for Build Transfer Operation contract. <br />
|
format |
Theses |
author |
PRIHARYUNINGTYAS (NIM 25005007), MEIRINA |
spellingShingle |
PRIHARYUNINGTYAS (NIM 25005007), MEIRINA A STUDY ON PARTNERSHIP SCHEME AND FINANCIAL FEASIBILITY OF SOREANG SPORT FACILITY DEVELOPMENT |
author_facet |
PRIHARYUNINGTYAS (NIM 25005007), MEIRINA |
author_sort |
PRIHARYUNINGTYAS (NIM 25005007), MEIRINA |
title |
A STUDY ON PARTNERSHIP SCHEME AND FINANCIAL FEASIBILITY OF SOREANG SPORT FACILITY DEVELOPMENT |
title_short |
A STUDY ON PARTNERSHIP SCHEME AND FINANCIAL FEASIBILITY OF SOREANG SPORT FACILITY DEVELOPMENT |
title_full |
A STUDY ON PARTNERSHIP SCHEME AND FINANCIAL FEASIBILITY OF SOREANG SPORT FACILITY DEVELOPMENT |
title_fullStr |
A STUDY ON PARTNERSHIP SCHEME AND FINANCIAL FEASIBILITY OF SOREANG SPORT FACILITY DEVELOPMENT |
title_full_unstemmed |
A STUDY ON PARTNERSHIP SCHEME AND FINANCIAL FEASIBILITY OF SOREANG SPORT FACILITY DEVELOPMENT |
title_sort |
study on partnership scheme and financial feasibility of soreang sport facility development |
url |
https://digilib.itb.ac.id/gdl/view/20275 |
_version_ |
1821120107724668928 |