DESIGN OF SUPPORT ALTERNATIVES AND CGT RAMP DOWN CROSS CUT IV STABILITY, L500 GUDANG HANDAK MINE, PT. ANEKA TAMBANG. TBK, UBPE PONGKOR ̉̉ WEST JAVA
Gudang handak mine is one of the underground gold mines of PT. Aneka Tambang.Tbk in Pongkor. Today the mining activity has been concentrated at the level of 500 meters, and as an effort to support the sustainability of the mine, development continues to be done to reach the level of 400 meters. In o...
Saved in:
Main Author: | MARCELL FANDY (NIM : 22110003), PATRICK |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/20387 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR
by: ISMI (NIM : 12105003); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc; Dr. Ganda Marihot Siman, FARIZ -
SILL PILLAR STABILITY ANALYSIS BASED ON JOINT MEASURING IN SOUTH CIURUG UNDERGROUND MINE, PT ANEKA TAMBANG Tbk. UBPE PONGKOR
by: OKTA TRIANSYAH (NIM : 12105018); Pembimbing : Dr. Ir. Budi Sulistianto, MT., ALHADI -
MEASURENTMENT OF RESISTANCE AT AIRWAYS AND VENTILATION SYSTEM NETWORK ANALYSIS IN MINE CIURUG UBPE PONGKOR, PT. ANEKA TAMBANG Tbk. USING SIMULATOR KAZEMARU
by: AKHMAD YUNADI (NIM 12101038); Pembimbing: Dr. Nuhindro Priagung Widodo, ST.,MT., NINO -
VENTILATION SYSTEM ANALYSIS With COEFFICIENT DIFFUSION CALCULATING of TRACER GAS METHOD in UBPE PONGKOR
by: EKA PUTRA (NIM 12101011), YULHANDRA -
ANALISIS PERGESERAN TITIK-TITIK PANTAU TAILING DAM UTAMA
(Studi Kasus PT. Aneka Tambang(Persero) Tbk. Unit Bisnis Pertambangan Emas, Pongkor)
by: , SANG PUTU INDRA GUNAWAN, et al.
Published: (2014)