EVALUATION AND OPTIMIZATION OF MINE DEWATERING SYSTEM AT CIURUG MINE PT. ANEKA TAMBANG TBK UBPE PONGKOR

Water is a common problem in mining activities, both in open pit and underground mines. If not handled properly, the incoming water may disrupt mining activities. Water problems occur in almost all mines, including the underground gold mine of PT Aneka Tambang, Tbk. UBPE Pongkor. The largest water p...

Full description

Saved in:
Bibliographic Details
Main Author: RADINA WIBISONO (NIM : 12113084), PANDU
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/23650
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia