EVALUATION AND OPTIMIZATION OF MINE DEWATERING SYSTEM AT CIURUG MINE PT. ANEKA TAMBANG TBK UBPE PONGKOR
Water is a common problem in mining activities, both in open pit and underground mines. If not handled properly, the incoming water may disrupt mining activities. Water problems occur in almost all mines, including the underground gold mine of PT Aneka Tambang, Tbk. UBPE Pongkor. The largest water p...
Saved in:
Main Author: | RADINA WIBISONO (NIM : 12113084), PANDU |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/23650 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY OF HYDROGEOLOGICAL CHARACTERISTICS FOR CONSIDERATION OF MINE DEWATERING PLAN AT CIURUG VEIN PT. ANEKA TAMBANG, TBK UBPE PONGKOR
by: DWIKA PARAMANANDA (NIM : 12113017), I.K. -
SILL PILLAR STABILITY ANALYSIS BASED ON JOINT MEASURING IN SOUTH CIURUG UNDERGROUND MINE, PT ANEKA TAMBANG Tbk. UBPE PONGKOR
by: OKTA TRIANSYAH (NIM : 12105018); Pembimbing : Dr. Ir. Budi Sulistianto, MT., ALHADI -
MEASURENTMENT OF RESISTANCE AT AIRWAYS AND VENTILATION SYSTEM NETWORK ANALYSIS IN MINE CIURUG UBPE PONGKOR, PT. ANEKA TAMBANG Tbk. USING SIMULATOR KAZEMARU
by: AKHMAD YUNADI (NIM 12101038); Pembimbing: Dr. Nuhindro Priagung Widodo, ST.,MT., NINO -
CHARACTERIZATION STUDY OF HYDROGEOLOGY FOR CONSIDERATION OF MINE DEWATERING DESIGN IN CIGUHA AND GUDANG HANDAK VEIN, PT ANEKA TAMBANG TBK. UBPE PONGKOR
by: Wirya Alamsyah, Prayoga -
STABILITY EVALUATION AND DESIGN SUPPORT OF TUNNEL ACCESS RAMP UP 4 CENTRAL CIURUG L450 PT. ANEKA TAMBANG TBK UBPE PONGKOR.
by: Yatjong, Isramyano