EVALUATION AND OPTIMIZATION OF MINE DEWATERING SYSTEM AT CIURUG MINE PT. ANEKA TAMBANG TBK UBPE PONGKOR

Water is a common problem in mining activities, both in open pit and underground mines. If not handled properly, the incoming water may disrupt mining activities. Water problems occur in almost all mines, including the underground gold mine of PT Aneka Tambang, Tbk. UBPE Pongkor. The largest water p...

Full description

Saved in:
Bibliographic Details
Main Author: RADINA WIBISONO (NIM : 12113084), PANDU
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/23650
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:23650
spelling id-itb.:236502017-09-28T15:28:23ZEVALUATION AND OPTIMIZATION OF MINE DEWATERING SYSTEM AT CIURUG MINE PT. ANEKA TAMBANG TBK UBPE PONGKOR RADINA WIBISONO (NIM : 12113084), PANDU Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/23650 Water is a common problem in mining activities, both in open pit and underground mines. If not handled properly, the incoming water may disrupt mining activities. Water problems occur in almost all mines, including the underground gold mine of PT Aneka Tambang, Tbk. UBPE Pongkor. The largest water problem in PT Antam UBPE Pongkor is in the Ciurug mine. Incoming water source at Ciurug mine comes from fractures in 3 places, namely crosscut XC 445-A with water discharge of 3.61 m3/min, crosscut XC 445-B with water discharge of 10.63 m3/minute, and front of the Central rampdown mine with water discharge of 1.83 m3/min. <br /> <br /> The mine dewatering system has been implemented to overcome the large water discharge that goes into the Ciurug mine by installing a number of pumps. From the applied dewatering system, it found that the flow problems are the imbalance between the inlet flow discharge and the existing pumping capacity at the B rampdown South Ciurug mine, mine sump 452, mine sump 2, mine sump XC 457 Central rampdown, and Utama mine sump. <br /> <br /> Based on the assessment of the dewatering system, it is recommended to decrease the total head system for pumps in 435-A mine sump, 445-B mine sump, XC 457 mine sump Central rampdown. The next recommendation is to increase the number of pumps at 452 mine sump and Utama mine sump. The total installed pump capacity of the recommendation is 19.01 m3/min (A rampdown is 3.94 m3/min, B rampdown is 11.24 m3/min and the Central rampdown is 3.83 m3/min). text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Water is a common problem in mining activities, both in open pit and underground mines. If not handled properly, the incoming water may disrupt mining activities. Water problems occur in almost all mines, including the underground gold mine of PT Aneka Tambang, Tbk. UBPE Pongkor. The largest water problem in PT Antam UBPE Pongkor is in the Ciurug mine. Incoming water source at Ciurug mine comes from fractures in 3 places, namely crosscut XC 445-A with water discharge of 3.61 m3/min, crosscut XC 445-B with water discharge of 10.63 m3/minute, and front of the Central rampdown mine with water discharge of 1.83 m3/min. <br /> <br /> The mine dewatering system has been implemented to overcome the large water discharge that goes into the Ciurug mine by installing a number of pumps. From the applied dewatering system, it found that the flow problems are the imbalance between the inlet flow discharge and the existing pumping capacity at the B rampdown South Ciurug mine, mine sump 452, mine sump 2, mine sump XC 457 Central rampdown, and Utama mine sump. <br /> <br /> Based on the assessment of the dewatering system, it is recommended to decrease the total head system for pumps in 435-A mine sump, 445-B mine sump, XC 457 mine sump Central rampdown. The next recommendation is to increase the number of pumps at 452 mine sump and Utama mine sump. The total installed pump capacity of the recommendation is 19.01 m3/min (A rampdown is 3.94 m3/min, B rampdown is 11.24 m3/min and the Central rampdown is 3.83 m3/min).
format Final Project
author RADINA WIBISONO (NIM : 12113084), PANDU
spellingShingle RADINA WIBISONO (NIM : 12113084), PANDU
EVALUATION AND OPTIMIZATION OF MINE DEWATERING SYSTEM AT CIURUG MINE PT. ANEKA TAMBANG TBK UBPE PONGKOR
author_facet RADINA WIBISONO (NIM : 12113084), PANDU
author_sort RADINA WIBISONO (NIM : 12113084), PANDU
title EVALUATION AND OPTIMIZATION OF MINE DEWATERING SYSTEM AT CIURUG MINE PT. ANEKA TAMBANG TBK UBPE PONGKOR
title_short EVALUATION AND OPTIMIZATION OF MINE DEWATERING SYSTEM AT CIURUG MINE PT. ANEKA TAMBANG TBK UBPE PONGKOR
title_full EVALUATION AND OPTIMIZATION OF MINE DEWATERING SYSTEM AT CIURUG MINE PT. ANEKA TAMBANG TBK UBPE PONGKOR
title_fullStr EVALUATION AND OPTIMIZATION OF MINE DEWATERING SYSTEM AT CIURUG MINE PT. ANEKA TAMBANG TBK UBPE PONGKOR
title_full_unstemmed EVALUATION AND OPTIMIZATION OF MINE DEWATERING SYSTEM AT CIURUG MINE PT. ANEKA TAMBANG TBK UBPE PONGKOR
title_sort evaluation and optimization of mine dewatering system at ciurug mine pt. aneka tambang tbk ubpe pongkor
url https://digilib.itb.ac.id/gdl/view/23650
_version_ 1821840624192585728