DESIGN OF PERFORMANCE MANAGEMENT SYSTEM FOR CORROSION CONTROL WORKS (MAINTENANCE) IN PT FREEPORT INDONESIẢ̉S MILL CONCENTRATING PLANT USING INTEGRATED PERFORMANCE MANAGEMENT SYSTEM APPROACH
Currently, the Mill area treats up 200,000 – 250,000 tonnes per day, which making it as one of the largest <br /> <br /> <br /> <br /> concentrating circuits/facilities in the world. This plant infrastructure was also consider as the main vital <br /> <br /...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/20760 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Currently, the Mill area treats up 200,000 – 250,000 tonnes per day, which making it as one of the largest <br />
<br />
<br />
<br />
concentrating circuits/facilities in the world. This plant infrastructure was also consider as the main vital <br />
<br />
<br />
<br />
core of mining operational process in PTFI area which nearly 80 million tonnes of ore are processed per <br />
<br />
<br />
<br />
year at average milling rates. <br />
<br />
<br />
<br />
<br />
Wet moisture and oxygen regenerate conditions that make oxidation occurred faster. Finally, as a combining <br />
<br />
<br />
<br />
consequence of the facility age and the environmental circumstance mentioned previously, PTFI’s existing <br />
<br />
<br />
<br />
structural facilities have suffered from extensive corrosion problem over the years. Even more, those <br />
<br />
<br />
<br />
corrosion issues have also been put as one of Mill Concentrating Division’s Safety Top Risk for the last 3 <br />
<br />
<br />
<br />
years (2014 – 2016). Bending, loss of thickness or crack is the worst effect caused by corrosion. The latest <br />
<br />
<br />
<br />
worst experienced by PTFI related with corrosion impact was occurred this year (Aug, 2016), when a Mill <br />
<br />
<br />
<br />
electrician was carrying out troubleshooting maintenance work on power cables located in an overhead <br />
<br />
<br />
<br />
cable tray. The employee was fell approximately 9 meters onto the concrete floor below the work area after <br />
<br />
<br />
<br />
the cable tray (which indicated was rusted/corroded) collapsed under the heavy load and the victim sustained <br />
<br />
<br />
<br />
fatal injuries. Fatality accident is intolerable at all, it is priceless and become an ultimate lost for the <br />
<br />
<br />
<br />
Company from any of all perspectives, and specifically in terms of PTFI Safety Standard compliance. Thus, <br />
<br />
<br />
<br />
Corrosion Control (maintenance) works are significantly required to be conducted as appropriately. <br />
<br />
<br />
<br />
<br />
The sequence plan implementation and the performance management system to measure the corrosion <br />
<br />
<br />
<br />
control progress are finally become the two most critical and crucial issues to be caught up in regard with <br />
<br />
<br />
<br />
the fighting of corrosion speed in this enormous area within the Mill Concentrating Plant itself. This research <br />
<br />
<br />
<br />
is significantly require to measure the current performance of corrosion control works which have been <br />
<br />
<br />
<br />
done previously and also for the works which currently still being completed using the Integrated <br />
<br />
<br />
<br />
Performance Management System (IPMS), as a novelty hybrid PMS model which seeks to improve the <br />
<br />
<br />
<br />
earlier research models with the implementation of Knowledge Based expert methodology system. This <br />
<br />
<br />
<br />
approach can assist in identifying and prioritizing the key decisions that need to be actioned to overcome <br />
<br />
<br />
<br />
the existing PMS shortcomings, so the main challenge for managing the performance of Company’s assets <br />
<br />
<br />
<br />
in terms of its strategies (excellent safety performance, efficient cost, effective people and organization, <br />
<br />
<br />
<br />
achieve production target and appropriate working environment) can be achieved as optimally. <br />
|
---|