DESIGN OF PERFORMANCE MANAGEMENT SYSTEM FOR CORROSION CONTROL WORKS (MAINTENANCE) IN PT FREEPORT INDONESIẢ̉S MILL CONCENTRATING PLANT USING INTEGRATED PERFORMANCE MANAGEMENT SYSTEM APPROACH
Currently, the Mill area treats up 200,000 – 250,000 tonnes per day, which making it as one of the largest <br /> <br /> <br /> <br /> concentrating circuits/facilities in the world. This plant infrastructure was also consider as the main vital <br /> <br /...
Saved in:
Main Author: | PRIAMBUDI 29115274, ADJI |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/20760 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
IMPROVEMENT ON PT. FREEPORT INDONESIA (PTFI) PERFORMANCE MANAGEMENT SYSTEM
by: KAISIEPO (NIM 29115348), ANTHONIUS -
THE DESIGN OF CONTRACTOR MANAGEMENT PERFORMANCE INDICATOR USING IPMS FRAMEWORK Case Study : Maintenance Department of Concentrating Division PT Freeport Indonesia
by: HARTOMO (NIM : 29107135); Pembimbing: Dr. Ir. Dermawan Wibisono, M. Eng, WISNU -
LONG TERM KINETIC STUDY OF ACID ROCK DRAINAGE FORMATION FROM PT. FREEPORT INDONESIẢ̉S TAILINGS
by: DEWI YUNIATI (NIM : 22108018), MUTIA -
IMPLEMENTING INDONESIẢ̉S MINING LAW DURING THE DEVELOPMENT OF THE KUCING LIAR MINE PT FREEPORT INDONESIA IN PAPUA PROVINCE
by: SETIAWAN 29115140, IWAN -
THE DESIGN OF ONLINE PERFORMANCE MANAGEMENT SYSTEM BY USING INTEGRATED PERFORMANCE MEASUREMENT SYSTEM FRAMEWORK (Case Study at Metallurgy Accounting Departement PT Freeport Indonesia)
by: HANAFI (NIM : 29107110); Pembimbing: Dr.Ir. Dermawan Wibisono, M. Eng, MUHAMMAD