DESIGN OF TECHNICAL AND OPERATIONAL ASPECTS OF RAIL ROAD AS SUPPORT TO PROJECT REVITALIZATION OF RAILWAY BRIDGE AT KAYU TANAM - PADANG PANJANG ̉̉ BATU TABAL CORRIDOR
The Design of Prestressed Concrete Railway Bridge At Batu Tabal – Padang Panjang – Kayu Tanam Corridor is one of the revitalization designs of 14 railway crossing bridges in the corridor. Initially this railway was used as coal mobilization from the Ombilin mine in Sawah Lunto to Bayur port of...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/20782 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:20782 |
---|---|
spelling |
id-itb.:207822017-12-15T13:39:07ZDESIGN OF TECHNICAL AND OPERATIONAL ASPECTS OF RAIL ROAD AS SUPPORT TO PROJECT REVITALIZATION OF RAILWAY BRIDGE AT KAYU TANAM - PADANG PANJANG ÃâÃâ BATU TABAL CORRIDOR ZIKRA AULIA, AFDAL Teknik jalan kereta api dan jalan raya Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/20782 The Design of Prestressed Concrete Railway Bridge At Batu Tabal – Padang Panjang – Kayu Tanam Corridor is one of the revitalization designs of 14 railway crossing bridges in the corridor. Initially this railway was used as coal mobilization from the Ombilin mine in Sawah Lunto to Bayur port of Padang. However, in the revitalization design of this railway line will be more focused to serve the passengers so it needs to be improved in terms of strength from the structural aspects and other aspects. In this Final Project, the writer will perform the design and analysis related to technical and operational aspects including design of railway component, geometric design of rail road from bridge location to Padang Panjang station, capacity analysis and forecasting of movement, station landscape design, and operating system / scheduling in GAPEKA scheme. The design of the technical and operational aspects of the rail line aims to support the revitalization project of railway bridge, corridor Kayu Tanam - Padang Panjang - Batu Tabal. In the geometric design will be designed horizontal alignment and vertical alignment of the plan trace. In the capacity analysis will be calculated the projection of passengers in the plan year and will be forecasting the movement related to the number of trains operating on each route. Furthermore, in the design of the station landscape will be determined the minimum length of the station's emplacement, the minimum requirement of the lane, and the design of switch. Then from forecasting movement, will be prepared GAPEKA as operational system. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Teknik jalan kereta api dan jalan raya |
spellingShingle |
Teknik jalan kereta api dan jalan raya ZIKRA AULIA, AFDAL DESIGN OF TECHNICAL AND OPERATIONAL ASPECTS OF RAIL ROAD AS SUPPORT TO PROJECT REVITALIZATION OF RAILWAY BRIDGE AT KAYU TANAM - PADANG PANJANG ̉̉ BATU TABAL CORRIDOR |
description |
The Design of Prestressed Concrete Railway Bridge At Batu Tabal – Padang Panjang – Kayu Tanam Corridor is one of the revitalization designs of 14 railway crossing bridges in the corridor. Initially this railway was used as coal mobilization from the Ombilin mine in Sawah Lunto to Bayur port of Padang. However, in the revitalization design of this railway line will be more focused to serve the passengers so it needs to be improved in terms of strength from the structural aspects and other aspects. In this Final Project, the writer will perform the design and analysis related to technical and operational aspects including design of railway component, geometric design of rail road from bridge location to Padang Panjang station, capacity analysis and forecasting of movement, station landscape design, and operating system / scheduling in GAPEKA scheme. The design of the technical and operational aspects of the rail line aims to support the revitalization project of railway bridge, corridor Kayu Tanam - Padang Panjang - Batu Tabal. In the geometric design will be designed horizontal alignment and vertical alignment of the plan trace. In the capacity analysis will be calculated the projection of passengers in the plan year and will be forecasting the movement related to the number of trains operating on each route. Furthermore, in the design of the station landscape will be determined the minimum length of the station's emplacement, the minimum requirement of the lane, and the design of switch. Then from forecasting movement, will be prepared GAPEKA as operational system. |
format |
Final Project |
author |
ZIKRA AULIA, AFDAL |
author_facet |
ZIKRA AULIA, AFDAL |
author_sort |
ZIKRA AULIA, AFDAL |
title |
DESIGN OF TECHNICAL AND OPERATIONAL ASPECTS OF RAIL ROAD AS SUPPORT TO PROJECT REVITALIZATION OF RAILWAY BRIDGE AT KAYU TANAM - PADANG PANJANG ̉̉ BATU TABAL CORRIDOR |
title_short |
DESIGN OF TECHNICAL AND OPERATIONAL ASPECTS OF RAIL ROAD AS SUPPORT TO PROJECT REVITALIZATION OF RAILWAY BRIDGE AT KAYU TANAM - PADANG PANJANG ̉̉ BATU TABAL CORRIDOR |
title_full |
DESIGN OF TECHNICAL AND OPERATIONAL ASPECTS OF RAIL ROAD AS SUPPORT TO PROJECT REVITALIZATION OF RAILWAY BRIDGE AT KAYU TANAM - PADANG PANJANG ̉̉ BATU TABAL CORRIDOR |
title_fullStr |
DESIGN OF TECHNICAL AND OPERATIONAL ASPECTS OF RAIL ROAD AS SUPPORT TO PROJECT REVITALIZATION OF RAILWAY BRIDGE AT KAYU TANAM - PADANG PANJANG ̉̉ BATU TABAL CORRIDOR |
title_full_unstemmed |
DESIGN OF TECHNICAL AND OPERATIONAL ASPECTS OF RAIL ROAD AS SUPPORT TO PROJECT REVITALIZATION OF RAILWAY BRIDGE AT KAYU TANAM - PADANG PANJANG ̉̉ BATU TABAL CORRIDOR |
title_sort |
design of technical and operational aspects of rail road as support to project revitalization of railway bridge at kayu tanam - padang panjang ãâãâ batu tabal corridor |
url |
https://digilib.itb.ac.id/gdl/view/20782 |
_version_ |
1821120260875485184 |