ANALYSIS OF FACTORS THAT INFLUENCE THE DELAY OF DAM PROJECTS WITH RISK MANAGEMENT APPROACH (Case Study: Kuningan Dam Construction - West Java)
The delays of the dam construction project mean the increased time for <br /> <br /> completion of the dam construction project which has been mutually agreed upon <br /> <br /> on contract documents. A lot of research on factors that can affect the delay of <br /> <...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/20858 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:20858 |
---|---|
spelling |
id-itb.:208582017-10-02T14:20:27ZANALYSIS OF FACTORS THAT INFLUENCE THE DELAY OF DAM PROJECTS WITH RISK MANAGEMENT APPROACH (Case Study: Kuningan Dam Construction - West Java) SAQOWI AMIN (NIM: 25015326), AHMAD Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/20858 The delays of the dam construction project mean the increased time for <br /> <br /> completion of the dam construction project which has been mutually agreed upon <br /> <br /> on contract documents. A lot of research on factors that can affect the delay of <br /> <br /> completion of road construction and building construction projects. From several <br /> <br /> studies, only few have examined the factors affecting the project delays of the <br /> <br /> dam, while the government is currently intensively conducting the construction of <br /> <br /> reservoirs or dams. <br /> <br /> Based on data from BAPPENAS (December 2014), the construction of water <br /> <br /> buildings, especially reservoirs in 2015 s.d. 2019. The government will build 49 <br /> <br /> reservoirs in almost all of Indonesia. The target of 49 reservoirs planned by the <br /> <br /> government should be supported by human resources, materials and tools. In <br /> <br /> addition, besides, it is necessary to be a strict supervisor so that one of the main <br /> <br /> factors of succeeding is the completion of the reservoir or dam on time without <br /> <br /> any delay. <br /> <br /> Therefore, it is necessary to do research to help the parties involved in the dam <br /> <br /> construction project (owner, konsutal and contractor) about the factors that <br /> <br /> influence the delay, so it can be known more detail factors of the delay that exists. <br /> <br /> The results of this study are expected to be used as a reference for owner, konsutal <br /> <br /> and contractor and parties involved in the dam construction project in order to <br /> <br /> know and anticipate the cause of the delay, so that they can complete the work on <br /> <br /> time in the next dam project. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The delays of the dam construction project mean the increased time for <br />
<br />
completion of the dam construction project which has been mutually agreed upon <br />
<br />
on contract documents. A lot of research on factors that can affect the delay of <br />
<br />
completion of road construction and building construction projects. From several <br />
<br />
studies, only few have examined the factors affecting the project delays of the <br />
<br />
dam, while the government is currently intensively conducting the construction of <br />
<br />
reservoirs or dams. <br />
<br />
Based on data from BAPPENAS (December 2014), the construction of water <br />
<br />
buildings, especially reservoirs in 2015 s.d. 2019. The government will build 49 <br />
<br />
reservoirs in almost all of Indonesia. The target of 49 reservoirs planned by the <br />
<br />
government should be supported by human resources, materials and tools. In <br />
<br />
addition, besides, it is necessary to be a strict supervisor so that one of the main <br />
<br />
factors of succeeding is the completion of the reservoir or dam on time without <br />
<br />
any delay. <br />
<br />
Therefore, it is necessary to do research to help the parties involved in the dam <br />
<br />
construction project (owner, konsutal and contractor) about the factors that <br />
<br />
influence the delay, so it can be known more detail factors of the delay that exists. <br />
<br />
The results of this study are expected to be used as a reference for owner, konsutal <br />
<br />
and contractor and parties involved in the dam construction project in order to <br />
<br />
know and anticipate the cause of the delay, so that they can complete the work on <br />
<br />
time in the next dam project. |
format |
Theses |
author |
SAQOWI AMIN (NIM: 25015326), AHMAD |
spellingShingle |
SAQOWI AMIN (NIM: 25015326), AHMAD ANALYSIS OF FACTORS THAT INFLUENCE THE DELAY OF DAM PROJECTS WITH RISK MANAGEMENT APPROACH (Case Study: Kuningan Dam Construction - West Java) |
author_facet |
SAQOWI AMIN (NIM: 25015326), AHMAD |
author_sort |
SAQOWI AMIN (NIM: 25015326), AHMAD |
title |
ANALYSIS OF FACTORS THAT INFLUENCE THE DELAY OF DAM PROJECTS WITH RISK MANAGEMENT APPROACH (Case Study: Kuningan Dam Construction - West Java) |
title_short |
ANALYSIS OF FACTORS THAT INFLUENCE THE DELAY OF DAM PROJECTS WITH RISK MANAGEMENT APPROACH (Case Study: Kuningan Dam Construction - West Java) |
title_full |
ANALYSIS OF FACTORS THAT INFLUENCE THE DELAY OF DAM PROJECTS WITH RISK MANAGEMENT APPROACH (Case Study: Kuningan Dam Construction - West Java) |
title_fullStr |
ANALYSIS OF FACTORS THAT INFLUENCE THE DELAY OF DAM PROJECTS WITH RISK MANAGEMENT APPROACH (Case Study: Kuningan Dam Construction - West Java) |
title_full_unstemmed |
ANALYSIS OF FACTORS THAT INFLUENCE THE DELAY OF DAM PROJECTS WITH RISK MANAGEMENT APPROACH (Case Study: Kuningan Dam Construction - West Java) |
title_sort |
analysis of factors that influence the delay of dam projects with risk management approach (case study: kuningan dam construction - west java) |
url |
https://digilib.itb.ac.id/gdl/view/20858 |
_version_ |
1821120287477858304 |