ANALYSIS OF FACTORS THAT INFLUENCE THE DELAY OF DAM PROJECTS WITH RISK MANAGEMENT APPROACH (Case Study: Kuningan Dam Construction - West Java)
The delays of the dam construction project mean the increased time for <br /> <br /> completion of the dam construction project which has been mutually agreed upon <br /> <br /> on contract documents. A lot of research on factors that can affect the delay of <br /> <...
Saved in:
Main Author: | SAQOWI AMIN (NIM: 25015326), AHMAD |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/20858 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY OF ENVIRONMENTAL IMPACT ON DAM CONSTRUCTION PLAN AT SOUTHERN WEST JAVA
by: ROYAN GALIH SURYA (NIM 95007318), ILMI -
RECITES PRIORITY NUMBER BUILD SEVERAL DAM IN WEST JAVA (STUDY CASE PLAN CILETUH DAM, CITEPUS DAM, SUKAHURIP DAM, HYANG DAM AND CIBATARUA DAM)
by: (NIM: 95007303), ERNAWATI -
SPILLWAY DESIGN PLAN FOR SADAWARNA DAM IN SUBANG REGENCY WEST JAVA
by: NA’IMA - NIM : 15813040 , NADRATUN -
Intra-Religious persecution in West Java :: Case study of Ahmadiyah Community in Manis Lor Kuningan
by: , AMIN, Ali, et al.
Published: (2005) -
GROUNDWATER SEEPAGE AND SPRING ANALYSIS IN SETUPATOK DAM, CIREBON REGENCY, WEST JAVA
by: ROLANDO SARUMPAET (NIM: 22014041), ERIK