DESIGN COMPARISON OF DRY BULK PORT BASED ON OCDI AND BS STANDARD IN CIREBON
The steam power plant (PLTU) unit 2 in Cirebon is planned to be completed by 2020. The plant relies on coal as an energy source. The construction of this steam power plant will certainly increase the need for coal, therefore it needs a new unloading port of coal. In the construction of coal dock, of...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/20907 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |