DESIGN COMPARISON OF DRY BULK PORT BASED ON OCDI AND BS STANDARD IN CIREBON

The steam power plant (PLTU) unit 2 in Cirebon is planned to be completed by 2020. The plant relies on coal as an energy source. The construction of this steam power plant will certainly increase the need for coal, therefore it needs a new unloading port of coal. In the construction of coal dock, of...

Full description

Saved in:
Bibliographic Details
Main Author: PUTERA SATRIA, ALBANY
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/20907
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first