DESIGN MATERIAL RECOVERY FACILITIES (MRF) AT TPA REGIONAL PIYUNGAN KARTAMANTUL

Increasing population in Sleman, Yogyakarta, and Bantul, has a logical consequence of increasing the amount of waste generation. Currently, waste from the three areas is transported and processed by Regional Piyungan Landfill located in Piyungan, Bantul regency, DIY. Land fill in TPA Piyungan uses o...

Full description

Saved in:
Bibliographic Details
Main Author: Listiyani Prayogo, Alina
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/20960
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:20960
spelling id-itb.:209602017-09-27T10:25:22ZDESIGN MATERIAL RECOVERY FACILITIES (MRF) AT TPA REGIONAL PIYUNGAN KARTAMANTUL Listiyani Prayogo, Alina Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/20960 Increasing population in Sleman, Yogyakarta, and Bantul, has a logical consequence of increasing the amount of waste generation. Currently, waste from the three areas is transported and processed by Regional Piyungan Landfill located in Piyungan, Bantul regency, DIY. Land fill in TPA Piyungan uses open dumping system, which full condition. Material Recovery Facilities (MRF) is a place where separation activities, recyling, washing / cleaning, packaging, and delivery of recycling products. This MRF is designed to process 20% of garbage entering TPA Piyungan for 10 years (2019-2029), the amount of waste processed in 2029 is 108.05 ton/day and the total population is 2,976,057 people. Sorting garbage will be done manualy, disaggregated waste that still have selling value that is, paper/cardboard, metal and glass will be sold to recycling factory. Food waste and leaves will be composted by windrow composting, plastic bottle waste are chopped by crusher machine into plastic flakes, plastic bag wastes are chopped, then processed by pelleticizing machine into plastic ore, while the residue will be transported to TPA Piyungan landfill. Piyungan TPST buildings consist of unloading areas, wastes containers, main hangars (sorting areas, plastic recycling units and compost pre-treatment), composting hangars, post-treatment compost hangars (sifting areas, granulator, and compost maturation), warehouses and offices. Total land area of 8,416 m2, with total constructed cost of Rp 10,158,267,553.00.Waste processing at MRF is not only economically valuable, but also has an environmental impact as it reduces waste dumping in the landfill. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Increasing population in Sleman, Yogyakarta, and Bantul, has a logical consequence of increasing the amount of waste generation. Currently, waste from the three areas is transported and processed by Regional Piyungan Landfill located in Piyungan, Bantul regency, DIY. Land fill in TPA Piyungan uses open dumping system, which full condition. Material Recovery Facilities (MRF) is a place where separation activities, recyling, washing / cleaning, packaging, and delivery of recycling products. This MRF is designed to process 20% of garbage entering TPA Piyungan for 10 years (2019-2029), the amount of waste processed in 2029 is 108.05 ton/day and the total population is 2,976,057 people. Sorting garbage will be done manualy, disaggregated waste that still have selling value that is, paper/cardboard, metal and glass will be sold to recycling factory. Food waste and leaves will be composted by windrow composting, plastic bottle waste are chopped by crusher machine into plastic flakes, plastic bag wastes are chopped, then processed by pelleticizing machine into plastic ore, while the residue will be transported to TPA Piyungan landfill. Piyungan TPST buildings consist of unloading areas, wastes containers, main hangars (sorting areas, plastic recycling units and compost pre-treatment), composting hangars, post-treatment compost hangars (sifting areas, granulator, and compost maturation), warehouses and offices. Total land area of 8,416 m2, with total constructed cost of Rp 10,158,267,553.00.Waste processing at MRF is not only economically valuable, but also has an environmental impact as it reduces waste dumping in the landfill.
format Final Project
author Listiyani Prayogo, Alina
spellingShingle Listiyani Prayogo, Alina
DESIGN MATERIAL RECOVERY FACILITIES (MRF) AT TPA REGIONAL PIYUNGAN KARTAMANTUL
author_facet Listiyani Prayogo, Alina
author_sort Listiyani Prayogo, Alina
title DESIGN MATERIAL RECOVERY FACILITIES (MRF) AT TPA REGIONAL PIYUNGAN KARTAMANTUL
title_short DESIGN MATERIAL RECOVERY FACILITIES (MRF) AT TPA REGIONAL PIYUNGAN KARTAMANTUL
title_full DESIGN MATERIAL RECOVERY FACILITIES (MRF) AT TPA REGIONAL PIYUNGAN KARTAMANTUL
title_fullStr DESIGN MATERIAL RECOVERY FACILITIES (MRF) AT TPA REGIONAL PIYUNGAN KARTAMANTUL
title_full_unstemmed DESIGN MATERIAL RECOVERY FACILITIES (MRF) AT TPA REGIONAL PIYUNGAN KARTAMANTUL
title_sort design material recovery facilities (mrf) at tpa regional piyungan kartamantul
url https://digilib.itb.ac.id/gdl/view/20960
_version_ 1821120316238200832