DESIGN OF INTAKE, SANDTRAP, AND HEADRACE ON CIROMPANG MICRO HYDRO POWER PLANT AT CIHIKEU VILLAGE, BUNGBULANG DISTRICTS, GARUT REGENCY, WEST JAVA
Electricity is one of the needs that today can be categorized as primary needs. Increased of population growth and lifestyle also affect the increasing demand for energy, in this case electricity. To meet this electricity demand, a renewable energy source such a water will be utilized. One of the ut...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/21000 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!