ANALYSIS OF THE EFFECT OF GRINDING BALL SIZE BLENDING ON THE OPTIMATION OF MILL CIRCUIT AT PT. ANTAM UBPE PONGKOR PROCESS PLANT
PT. Antam UBPE Pongkor is one of underground gold mining in Indonesia. For the last five years, from 2008 until 2012, feed grade of PT. Antam UBPE Pongkor decreases, and drastically decreases in 2011 and 2012. In 2008, feed grade of PT. Antam UBPE Pongkor is 9,20 gpt. While in 2012, the feed grade d...
Saved in:
Main Author: | APRIYANTO (NIM : 12509034), ANDI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/21038 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
Similar Items
-
OPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR
by: ISMI (NIM : 12105003); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc; Dr. Ganda Marihot Siman, FARIZ -
STUDY OF UTILIZATION OF MAGNETIC ACTIVATED CARBON AS ALTERNATIVE SUBSTITUTION FOR ACTIVATED CARBON IN CARBON IN-LEACH SYSTEM AT UBPE PONGKOR - PT ANTAM (PERSERO) TBK
by: KURNIADANI (NIM : 22109306), HAMZAH -
SILL PILLAR STABILITY ANALYSIS BASED ON DISCONTINUITY PLANE IN CROSSCUT 10.4 SOUTH CIURUG UNDERGROUND MINE, UBPE PONGKOR PT. ANTAM Tbk.
by: PUTRA ADHI LAKSANA (NIM : 12106014); Pembimbing : Dr. Ir. Budi Sulistianto, MT., M. -
WATER BALANCE ANALYSIS FOR DETERMINING POTENTIAL OVERTOPPING IN TAILING STORAGE FACILITY (TAILING DAM) (CASE STUDY: PT. ANTAM TBK. UBPE PONGKOR, WEST JAVA)
by: ALFI LAILAH AHSAR (NIM: 12811042); Pembimbing: Dr. Plato Martuani Siregar, M.Si , NUR -
VENTILATION SYSTEM ANALYSIS With COEFFICIENT DIFFUSION CALCULATING of TRACER GAS METHOD in UBPE PONGKOR
by: EKA PUTRA (NIM 12101011), YULHANDRA