#TITLE_ALTERNATIVE#

Project scheduling is one of the important factor in designing construction project. Project schedule is needed so that project can work smoothly and finish on time. Project schedule is made to give information about when an assignment has to be started or finished. Without a good project schedule,...

Full description

Saved in:
Bibliographic Details
Main Author: ZANUAR RIZKIANTO (NIM : 15011062), ARDI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/21206
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:21206
spelling id-itb.:212062017-09-27T10:25:51Z#TITLE_ALTERNATIVE# ZANUAR RIZKIANTO (NIM : 15011062), ARDI Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/21206 Project scheduling is one of the important factor in designing construction project. Project schedule is needed so that project can work smoothly and finish on time. Project schedule is made to give information about when an assignment has to be started or finished. Without a good project schedule, project can be delayed and overrun the project budget. Scope of work in this project is only for preparation work, earth work, foundation work, and structural work. Milestone and resources are the boundary used on this design. There are two factor that influence length of duration of the schedule: assignment with heavy equipment and assignment non-heavy equipment (productivity of manpower as the factor). This project schedule design is made using by software project management. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Project scheduling is one of the important factor in designing construction project. Project schedule is needed so that project can work smoothly and finish on time. Project schedule is made to give information about when an assignment has to be started or finished. Without a good project schedule, project can be delayed and overrun the project budget. Scope of work in this project is only for preparation work, earth work, foundation work, and structural work. Milestone and resources are the boundary used on this design. There are two factor that influence length of duration of the schedule: assignment with heavy equipment and assignment non-heavy equipment (productivity of manpower as the factor). This project schedule design is made using by software project management.
format Final Project
author ZANUAR RIZKIANTO (NIM : 15011062), ARDI
spellingShingle ZANUAR RIZKIANTO (NIM : 15011062), ARDI
#TITLE_ALTERNATIVE#
author_facet ZANUAR RIZKIANTO (NIM : 15011062), ARDI
author_sort ZANUAR RIZKIANTO (NIM : 15011062), ARDI
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/21206
_version_ 1821120392756985856