#TITLE_ALTERNATIVE#
Project scheduling is one of the important factor in designing construction project. Project schedule is needed so that project can work smoothly and finish on time. Project schedule is made to give information about when an assignment has to be started or finished. Without a good project schedule,...
Saved in:
Main Author: | ZANUAR RIZKIANTO (NIM : 15011062), ARDI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/21206 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: RISMAN, ARDI -
#TITLE_ALTERNATIVE#
by: Ariawan (NIM 132 00 078), Ardi -
#TITLE_ALTERNATIVE#
by: ARDI HARTOMO , WAHYU -
#TITLE_ALTERNATIVE#
by: IRAWAN PUTRA (NIM 129 05 004), ARDI -
#TITLE_ALTERNATIVE#
by: ARDI SUBAKDO (NIM:23412006); Pembimbing: Dr. Sukoyo., WAWAN