IMPROVEMENT IN DRILLING PROCESS UTILIZATION TO INCREASE PRODUCTION RATE AT LOWER WANAGON PROJECT PT FREEPORT INDONESIA

PT Freeport Indonesia (PTFI) is a mining company which operate in Mimika, Papua <br /> <br /> province. This company market concentrates containing copper, gold, and silver to around <br /> <br /> the world. Right now, PTFI has big project related mine closure phase at Lower...

Full description

Saved in:
Bibliographic Details
Main Author: WIJAYANTO 29115304, ARIEF
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/21222
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:21222
spelling id-itb.:212222017-10-12T15:23:18ZIMPROVEMENT IN DRILLING PROCESS UTILIZATION TO INCREASE PRODUCTION RATE AT LOWER WANAGON PROJECT PT FREEPORT INDONESIA WIJAYANTO 29115304, ARIEF Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/21222 PT Freeport Indonesia (PTFI) is a mining company which operate in Mimika, Papua <br /> <br /> province. This company market concentrates containing copper, gold, and silver to around <br /> <br /> the world. Right now, PTFI has big project related mine closure phase at Lower Wanagon <br /> <br /> area. This project is very important for the company as a compliance commitment with <br /> <br /> Government of Indonesia regulation. Project started since 2011 and will be completed in <br /> <br /> 2023. Objective of this project is to stabilize the overburden material through re-sloping <br /> <br /> process. Total earthwork volume of this project is approximately 260 Million tons. <br /> <br /> Company expected this project must completed on schedule to avoid additional cost in the <br /> <br /> future. <br /> <br /> Until 2017, achievement of this project is still 35.5% from the completion target due to <br /> <br /> production rate is low. In this project, production rate is influenced by the mining processes <br /> <br /> which consist of drilling, blasting, loading, and hauling. This final project will focus to <br /> <br /> identifies source of bottleneck in the mining processes and propose alternative solutions in <br /> <br /> order to increase production rate. <br /> <br /> Bottleneck Identification Model (BMI) that proposed by Kahraman in his dissertation on <br /> <br /> 2015 is used as a framework. This model is compare all mining equipment capacity and <br /> <br /> actual process rate to identify the bottleneck. This final project found that drilling process <br /> <br /> utilization is source of bottleneck. Top four standby reason which become main contributor <br /> <br /> in poor drill utilization are waiting area, shift change, no operator, and up from repair. <br /> <br /> These standby reason contributes 85.4% of total standby time. Proposed alternative <br /> <br /> solution such as improvement in shift change cycle, create integrated mine plan, change <br /> <br /> communication procedure are developed to eliminate or reduce standby time duration. <br /> <br /> Improvement in drill utilization give significant impact to increase 53.6% of drilling <br /> <br /> production rate. Ramping up scenario that proposed in this final project can be used by <br /> <br /> Company's management in order to achieve the completion target in 2023. The <br /> <br /> implementation process should planned and controlled. Therefore, responsibility persons, <br /> <br /> timeline, monitoring tools, and evaluation shall determine prior execution. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Freeport Indonesia (PTFI) is a mining company which operate in Mimika, Papua <br /> <br /> province. This company market concentrates containing copper, gold, and silver to around <br /> <br /> the world. Right now, PTFI has big project related mine closure phase at Lower Wanagon <br /> <br /> area. This project is very important for the company as a compliance commitment with <br /> <br /> Government of Indonesia regulation. Project started since 2011 and will be completed in <br /> <br /> 2023. Objective of this project is to stabilize the overburden material through re-sloping <br /> <br /> process. Total earthwork volume of this project is approximately 260 Million tons. <br /> <br /> Company expected this project must completed on schedule to avoid additional cost in the <br /> <br /> future. <br /> <br /> Until 2017, achievement of this project is still 35.5% from the completion target due to <br /> <br /> production rate is low. In this project, production rate is influenced by the mining processes <br /> <br /> which consist of drilling, blasting, loading, and hauling. This final project will focus to <br /> <br /> identifies source of bottleneck in the mining processes and propose alternative solutions in <br /> <br /> order to increase production rate. <br /> <br /> Bottleneck Identification Model (BMI) that proposed by Kahraman in his dissertation on <br /> <br /> 2015 is used as a framework. This model is compare all mining equipment capacity and <br /> <br /> actual process rate to identify the bottleneck. This final project found that drilling process <br /> <br /> utilization is source of bottleneck. Top four standby reason which become main contributor <br /> <br /> in poor drill utilization are waiting area, shift change, no operator, and up from repair. <br /> <br /> These standby reason contributes 85.4% of total standby time. Proposed alternative <br /> <br /> solution such as improvement in shift change cycle, create integrated mine plan, change <br /> <br /> communication procedure are developed to eliminate or reduce standby time duration. <br /> <br /> Improvement in drill utilization give significant impact to increase 53.6% of drilling <br /> <br /> production rate. Ramping up scenario that proposed in this final project can be used by <br /> <br /> Company's management in order to achieve the completion target in 2023. The <br /> <br /> implementation process should planned and controlled. Therefore, responsibility persons, <br /> <br /> timeline, monitoring tools, and evaluation shall determine prior execution.
format Theses
author WIJAYANTO 29115304, ARIEF
spellingShingle WIJAYANTO 29115304, ARIEF
IMPROVEMENT IN DRILLING PROCESS UTILIZATION TO INCREASE PRODUCTION RATE AT LOWER WANAGON PROJECT PT FREEPORT INDONESIA
author_facet WIJAYANTO 29115304, ARIEF
author_sort WIJAYANTO 29115304, ARIEF
title IMPROVEMENT IN DRILLING PROCESS UTILIZATION TO INCREASE PRODUCTION RATE AT LOWER WANAGON PROJECT PT FREEPORT INDONESIA
title_short IMPROVEMENT IN DRILLING PROCESS UTILIZATION TO INCREASE PRODUCTION RATE AT LOWER WANAGON PROJECT PT FREEPORT INDONESIA
title_full IMPROVEMENT IN DRILLING PROCESS UTILIZATION TO INCREASE PRODUCTION RATE AT LOWER WANAGON PROJECT PT FREEPORT INDONESIA
title_fullStr IMPROVEMENT IN DRILLING PROCESS UTILIZATION TO INCREASE PRODUCTION RATE AT LOWER WANAGON PROJECT PT FREEPORT INDONESIA
title_full_unstemmed IMPROVEMENT IN DRILLING PROCESS UTILIZATION TO INCREASE PRODUCTION RATE AT LOWER WANAGON PROJECT PT FREEPORT INDONESIA
title_sort improvement in drilling process utilization to increase production rate at lower wanagon project pt freeport indonesia
url https://digilib.itb.ac.id/gdl/view/21222
_version_ 1821120397288931328