SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG
Project scheduling is one of the important factor in designing construction project. Project schedule is needed so that project can work smoothly and finish on time. Project schedule is made to give information about when an assignment has to be started or finished. Without a <br /> <br...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/21520 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:21520 |
---|---|
spelling |
id-itb.:215202017-09-27T10:25:49ZSCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG ANDITA SETYA PERMATASARI , CICILIA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/21520 Project scheduling is one of the important factor in designing construction project. Project schedule is needed so that project can work smoothly and finish on time. Project schedule is made to give information about when an assignment has to be started or finished. Without a <br /> <br /> <br /> good project schedule, project can be delayed and overrun the project budget. Scope of work in this project schedule is only for preparation work, earth work, foundation work, and structural work. Milestone and resources are the boundary used on this design. There are two factor that influence length of duration of the schedule: assignment with heavy equipment and assignment non-heavy equipment (productivity of manpower as the factor). This project schedule design is made using Microsoft Project 2010. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Project scheduling is one of the important factor in designing construction project. Project schedule is needed so that project can work smoothly and finish on time. Project schedule is made to give information about when an assignment has to be started or finished. Without a <br />
<br />
<br />
good project schedule, project can be delayed and overrun the project budget. Scope of work in this project schedule is only for preparation work, earth work, foundation work, and structural work. Milestone and resources are the boundary used on this design. There are two factor that influence length of duration of the schedule: assignment with heavy equipment and assignment non-heavy equipment (productivity of manpower as the factor). This project schedule design is made using Microsoft Project 2010. |
format |
Final Project |
author |
ANDITA SETYA PERMATASARI , CICILIA |
spellingShingle |
ANDITA SETYA PERMATASARI , CICILIA SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG |
author_facet |
ANDITA SETYA PERMATASARI , CICILIA |
author_sort |
ANDITA SETYA PERMATASARI , CICILIA |
title |
SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG |
title_short |
SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG |
title_full |
SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG |
title_fullStr |
SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG |
title_full_unstemmed |
SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG |
title_sort |
scheduling design of construction project center for advanced sciences (cas) institut teknologi bandung |
url |
https://digilib.itb.ac.id/gdl/view/21520 |
_version_ |
1821120485509824512 |