SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG

Project scheduling is one of the important factor in designing construction project. Project schedule is needed so that project can work smoothly and finish on time. Project schedule is made to give information about when an assignment has to be started or finished. Without a <br /> <br...

Full description

Saved in:
Bibliographic Details
Main Author: ANDITA SETYA PERMATASARI , CICILIA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/21520
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:21520
spelling id-itb.:215202017-09-27T10:25:49ZSCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG ANDITA SETYA PERMATASARI , CICILIA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/21520 Project scheduling is one of the important factor in designing construction project. Project schedule is needed so that project can work smoothly and finish on time. Project schedule is made to give information about when an assignment has to be started or finished. Without a <br /> <br /> <br /> good project schedule, project can be delayed and overrun the project budget. Scope of work in this project schedule is only for preparation work, earth work, foundation work, and structural work. Milestone and resources are the boundary used on this design. There are two factor that influence length of duration of the schedule: assignment with heavy equipment and assignment non-heavy equipment (productivity of manpower as the factor). This project schedule design is made using Microsoft Project 2010. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Project scheduling is one of the important factor in designing construction project. Project schedule is needed so that project can work smoothly and finish on time. Project schedule is made to give information about when an assignment has to be started or finished. Without a <br /> <br /> <br /> good project schedule, project can be delayed and overrun the project budget. Scope of work in this project schedule is only for preparation work, earth work, foundation work, and structural work. Milestone and resources are the boundary used on this design. There are two factor that influence length of duration of the schedule: assignment with heavy equipment and assignment non-heavy equipment (productivity of manpower as the factor). This project schedule design is made using Microsoft Project 2010.
format Final Project
author ANDITA SETYA PERMATASARI , CICILIA
spellingShingle ANDITA SETYA PERMATASARI , CICILIA
SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG
author_facet ANDITA SETYA PERMATASARI , CICILIA
author_sort ANDITA SETYA PERMATASARI , CICILIA
title SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG
title_short SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG
title_full SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG
title_fullStr SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG
title_full_unstemmed SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG
title_sort scheduling design of construction project center for advanced sciences (cas) institut teknologi bandung
url https://digilib.itb.ac.id/gdl/view/21520
_version_ 1821120485509824512