SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG
Project scheduling is one of the important factor in designing construction project. Project schedule is needed so that project can work smoothly and finish on time. Project schedule is made to give information about when an assignment has to be started or finished. Without a <br /> <br...
Saved in:
Main Author: | ANDITA SETYA PERMATASARI , CICILIA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/21520 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF SEWERAGE AND WASTEWATER TREATMENT IN INDUSRIAL RESEARCH CAMPUS OF INSTITUTE TEKNOLOGI BANDUNG IN KABUPATEN BEKASI
by: NABILA, GHAISANI -
DESIGN OF UPPER STRUCTURE OF LIFESTYLE CENTER SUMMARECON BANDUNG MALL PROJECT
by: SUTEJO, HERMAWAN -
DESIGN OF BORED PILE FOUNDATION LIFESTYLE CENTER SUMMARECON BANDUNG PROJECT
by: HAWARI (NIM: 15013154), KASYFU -
IMPROVEMENT ON CONSTRUCTABILITY APPRAISAL SYSTEM (CAS)
by: CHAO CHIA LING
Published: (2012) -
METHODS OF JOB HAZARD ANALYSIS AND WHAT-IF/CHECKLIST FOR HAZARD IDENTIFICATION AND RISK ANALYSIS ON CONSTRUCTION OF INSTITUT TEKNOLOGI BANDUNG DORMITORY BUILDING C AND D
by: FADHAL BAMAHRY (NIM: 25314301), CRETACEOUS